My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11-26-1997 Council Agenda
>
City Council Packets
>
1990-1999
>
1997
>
11-26-1997 Council Agenda
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/5/2014 3:08:43 PM
Creation date
3/11/2013 1:52:00 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
184
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The following summarizes the results of the low single quote received: <br />Low F.M. Frattalone Excavating <br />AMOUNT <br />$28,200.00 <br />The low quoter on the project was F.M. Frattalone Excavating with a Base Bid of $28,200.00. <br />The estimate for the project was $22,000. The quote has been reviewed and found to be in order. <br />However, because of the legal requirement that any public contract over $25,000 must be <br />publicly advertised, we recommend that one item be removed. The logical item to remove is the <br />one item which is for offsite work: placing rip rap rock at the culvert off of Centerville Road. The <br />resulting bid is $24,720. The actual cost of the project could be significantly less than this if the <br />street surface can be kept in place on most of the repairs. The high water table makes this <br />uncertain. <br />We recommend awarding the contract to Frattalone Excavating at a revised quote amount of <br />$24,720. <br />Should you have any questions, please feel free to contact me at 636 -4805. <br />Sincerely, <br />BONESTROO, ROSENE, ANDERLIK & ASSOCIATES, INC. <br />Paul G. Heuer, P.E. <br />Pc: Joel Hanson <br />Scott Tangen <br />Page 171 <br />
The URL can be used to link to this page
Your browser does not support the video tag.