Laserfiche WebLink
The final amount of the contract shall be determined by multiplying the final measured <br />quantities of the various items actually constructed and installed by the unit prices <br />therefore, in the manner prescribed in the specifications. However, the low bidder shall <br />be determined by adding the sums resulting from multiplying the quantities stated by the <br />unit prices bid therefore. <br />Accompanying this bid is a bidder's bond, certified check, or cash deposit in the amount of <br />five percent (5 %) of amount bid , which is at least five percent (5 %) of the amount of <br />my /our bid made payable to the Owner, and the same is subject to forfeiture in the <br />event of default on the part of the undersigned or failure on the part of the undersigned <br />to execute the prescribed contract and bond within fifteen (15) days after its submittal <br />to me /us. <br />In submitting this bid, it is understood that the Owner retains the right to reject any and <br />all bids and to waive irregularities and informalities therein and to award the contract to <br />the best interests of the Owner. <br />In submitting this bid, it is understood that payment will be by cash or check. <br />It is understood that bids may not be withdrawn for a period of 45 days after the date and <br />time set for the opening of bids. It is understood that the Owner reserves the right to <br />retain the certified check or bond of the three lowest bidders as determined by the Owner <br />for a period not to exceed 45 days after the date set for the opening of bids. <br />Respectfully submitted, <br />F.M. Frattalone Excavating & Grading, Inc. <br />Name <br />R <br />Signer <br />President <br />Title <br />Mark R. Ryan <br />Printed Name of Signer <br />Page 174 <br />37235 Bidtab.wb2 <br />(A Corporation) <br />(An Individual) <br />(A Partnership) <br />