Laserfiche WebLink
Wednesday, March 20, 1996 02:41:25 PM PFA Paul Finsness Architects Page 2 of 4 <br />6. Other: <br />a. Accessible water cooler, <br />b. Accessible signage. <br />c. Accessible parking spaces. <br />d. Accessible entrance walkway. <br />Upper Level <br />1. Stair: <br />a. Non -rated enclosure with door to east storage at the top of the stairs. <br />2.. Toilet: <br />a. Toilet exhaust vent. <br />3. Utility: <br />a. Existing sink, water supply and waste piping removal. <br />4. Mechanical /Electrical: <br />a. Adequate clearance at gas -fired boiler. <br />5. Other: <br />a. Replace existing roofing and roof insulation as required. <br />b. Install additional roof insulation as required. <br />c. Replace existing gutters and downspouts. <br />d. Extend existing hose tower wall parapets. <br />e. Remove existing siren steel angle support frame. <br />f. Tuckpolnt face brick and repair masonry wall cracks as required. <br />g. Exterior wall painting as required. <br />Enclosure <br />cc: Greg Schmit <br />Mike Webert <br />Carl Nopola <br />File <br />2 <br />Page 89 <br />