My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03-27-1985 Council Agenda
>
City Council Packets
>
1980-1989
>
1985
>
03-27-1985 Council Agenda
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/19/2013 7:51:59 AM
Creation date
3/19/2013 7:49:57 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF LITTLE CANADA <br />Preliminary Report <br />Improvement 85 -4 <br />LOCATION: Allan Ave.. from Thunder Bay to Greenbrier <br />IMPROVEMENTS: R.O.W. Acquisition, grading, sanitary sewer, <br />vtatermain, storm sewer, gravel base, concrete <br />curb & gutter & bituminous surface <br />EASEMENTS: Non required <br />RIGHT -OF -WAY: Must be required <br />SPECIAL The cost per lot is larger than might be expected <br />CONDITIONS: because Allan Ave. is a side street. Consequently <br />there is less frontage assessable. In addition, <br />the property is still unplatted and exists in <br />narrow (unbuildable) lots. This could result in a <br />very complicated assessment. Ln order for future <br />development certain land trades or transactions <br />will have to be made. <br />FINANCING: Estimated Cost East property line Thunder Bay <br />Addition to Greenbrier - Impr. 85 -4 <br />Construction $ 51,445.00 <br />Contingency 5,145.00 <br />Legal 3,087.00 <br />Fiscal 1,029.00 <br />Administration 1,029.00 <br />Engineering 9,260.00 <br />TOTAL $ 70,995.00 <br />Capital Interest 7,100.00 <br />$ 78,095.00 <br />Total frontage = 6 lots <br />Cost per lot = 13,015.00 (See Special Conditions) <br />2 1. <br />
The URL can be used to link to this page
Your browser does not support the video tag.