My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03-09-1977 Council Agenda
>
City Council Packets
>
1975-1979
>
1977
>
03-09-1977 Council Agenda
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2013 3:19:58 PM
Creation date
4/4/2013 3:18:14 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
the Per Diem rates set forth in Section II of this Agreement. <br />If alternate or deductive bidding is used, the basic or prime <br />bid shall be considered the highest alternate and the percentage <br />rates shall apply to this figure. <br />C. CANCELLATION <br />If any work is cancelled, in whole or in part, the percentage <br />rates shall not apply; the Engineer shall be paid for all work <br />performed up to such time as he is notified in writing of said <br />cancellation, based upon the Per Diem rates outlined in Section <br />II of this agreement. <br />SECTION II <br />OTHER PROFESSIONAL SERVICES <br />Certain services as described below may be ordered by the Owner and <br />performed by the Engineer or others under his direction. The Owner <br />shall pay the Engineer for these services on the basis of an hourly <br />rate as follows: <br />Principal Engineer $25.00 <br />Chief Project Engineer 19.00 <br />Project Engineer 17.00 <br />Draftsmen 16.00 <br />Survey Party - 3 Man . . • • . . . . . . . . . 42.00 <br />Survey Party - 2 Man 30.00 <br />Surveyor 23.00 <br />Clerical 8.50 <br />These rates include all transportation, material, equipment, insurance <br />and overhead. <br />21 <br />
The URL can be used to link to this page
Your browser does not support the video tag.