Laserfiche WebLink
City Council <br />City of Little Canada <br />515 E. Little Canada Rd. <br />St. Paul, ?IN 5511,/ <br />500 West Highway 96 <br />St. Paul. Minnesota 55112 <br />484-3301 <br />RE: <br />400 E. St. Germain St. <br />St. Cloud. Minnesota 56301 <br />251-7751 <br />314 Oak Street <br />Sauk Centre. Minnesota 56378 <br />3523664 <br />Oct. 24, 1979 <br />Final Payment <br />Proj: WM Impr. 77- 1,2,3,4,7,9 <br />and part of 77 -6 <br />Contr: Centennial Contractors <br />1. Trees Clearing 9 Each <br />2. Trees Grubbing 9 Each <br />3. Augering 16" Steel Casing 168 L.F. <br />4. 8" DIP WM 10,322 L.F. <br />5. 6" DIP WM 7,451 L.F. <br />6. 8" GV & Box 13 Each <br />7. 6" GV & Box 10 Each <br />8. Hydrants 28 Each <br />9. 8 x 6 Tee 25 Each <br />10. 8" Tee 1 Each <br />11. 8 x 6 Reducer 2 Each <br />12. 12 x 8 Reducer 1 Each <br />13. 8" Bends 4 Each <br />14. 8" Plugs 5 Each <br />15. 6" Plugs 13 Each <br />16. 6" Tee 19 Each <br />17. 6" Bends 4 Each <br />18. 8x6 Cross 1 Each <br />19. 20' Long 1" Cop. Hse. Ser 118 Each <br />20. 25' Long 1" Cop Hse Sery 1 Each <br />21. 40' Long 1" cop Hse Sery 45 Each <br />22. 40' Long 1" Cop Hse Sery <br />(Pushed) 66 Each <br />23. 1" Copper Tubing (Ex Length) 38 L.F. <br />24. Trench Stabilization 521 Ton <br />25. Class 2 Base 7173.6 Ton <br />26. Bit. Binder . Course (2331)2560 Ton 2285 Ton <br />28. Topsoil 2808 C.Y. <br />29. Seed 85 lbs. <br />30. Sod 23,635 S.Y. <br />TOTAL PART I <br />$ 10.00 <br />10.00 <br />50.00 <br />11.20 <br />10.00 <br />320.00 <br />230.00 <br />600.00 <br />130.00 <br />140.00 <br />80.00 <br />110.00. <br />80.00 <br />30.00 <br />20.00. <br />100.00 <br />60.00 <br />160.00 <br />270.00 <br />290.00 <br />350.00 <br />500.00 <br />4.00 <br />2.00 <br />4.60 <br />12.50 <br />14.00 <br />4.70 <br />8.00 <br />1.10 <br />$ . 90.00 <br />90.00 <br />8,400.00 <br />115,606.40 <br />74,510.00 <br />4,160.00 <br />2,300.00 <br />16,800.00 <br />3,250.00 <br />140.00 <br />160.00 <br />110.00 <br />320.00 <br />150.00 <br />260.00 <br />1,900.00 <br />240.00 <br />160.00 <br />31,860.00 <br />290.00 <br />15,750.00 <br />33,000.00 <br />152.00 <br />1,042.00 <br />32,998.56 <br />32,000.00 <br />31,990.00 <br />13,197.60 <br />680.00 <br />25,998.50 <br />$447,605.06 <br />41 <br />