Laserfiche WebLink
cy of Little Canada -2- <br />1. Trees Clearing <br />2. Trees Grubbing <br />3. Excavation <br />4. CMP (16 Ga) <br />5. 12" CMP Tee <br />6. Catch Basin <br />7. 8" VCP Ex. Strength <br />8. 4" Extra Heavy CIP <br />9. Manholes <br />10. Outside Drop (Metro MH) <br />11. MH Castings <br />12. 8 x 4 VCP Wyes <br />13. Trenching 0 -8' <br />14. Trenching 8 -10' <br />15. Trenching 10 -12 <br />16. Trenching 12- 144 :.• <br />17. F & I Barricades <br />18. Class <br />19. <br />20. <br />21. <br />22. <br />PART II <br />Bituminous Material Prime Coa <br />Bituminous Wearing Course <br />Bituminous Curb <br />Topsoil <br />Final Payment <br />154 Each <br />154 Each <br />5070 C.Y. <br />359 L.F. <br />1 . Each <br />2 Each <br />703 L.F. <br />280 L.F. <br />43 L.F. <br />1 Each <br />5 Each <br />12 Each <br />65 L.F. <br />499 L.F. <br />20 L.F. <br />143 L.F. <br />3 Each <br />1,148.63 Ton <br />t 600 Gal <br />392.18 Ton <br />2248 L.F. <br />10 S.Y. <br />TOTAL PART II <br />Total Part I $ 447,605.06 <br />Total Part II 43,153.37 <br />$ 490,758.43 <br />Change Order No. 1 17,737.83 <br />Change Order No. 3 386.23 <br />Change Order No. 4 440.00 <br />$ 18,564.06 <br />GRAND TOTAL <br />Less Previous Payments <br />FINAL PAYMENT FOR WORK COMPLETED <br />$ 509,322.49 <br />508,322.49 <br />$ 1,000.00 <br />APPROVED: MILNER SC INC. hil-d <br />BY - <br />0. Carley, P.E. <br />Vice President <br />$10.00 <br />10.00 <br />0.50 <br />10.00 <br />70.00 <br />400.00 <br />2.20 <br />9.00 <br />55.00 <br />2400.00 <br />80.00 <br />15.00 <br />6.00 <br />7.00 <br />8.00 <br />9.00 <br />700.00 <br />4.60 <br />0.60 <br />16.00 <br />1.90 <br />4.70 <br />$1,540.00 <br />1,540.00 <br />2,535.00 <br />3,590.00 <br />70.00 <br />800.00 <br />1,546.60 <br />2,520.00 <br />2,365.00 <br />2,400.00 <br />400.00 <br />180.00 <br />390.00 <br />3,493.00 <br />160.00 <br />1,287.00 <br />2,100.00 <br />5,283.69 <br />360.00 <br />6,274.88 <br />4,271.20 <br />47.00 <br />$43,153.37 <br />