Laserfiche WebLink
3. Construction Plans: Construction plans shall include detailed <br />working drawings with sufficient sections, elevations and <br />structural details to enable a prospective Contractor to quote <br />or hid a firm price on the work without additional engineering. <br />4. Construction Specifications: Specifications shall be of sufficient <br />scope to enable a prospective Contractor to quote or bid a firm <br />price based on a set standard of quality, performance and procedure. <br />8. BASIC FEE DALE <br />The percentage rates shown below shall be cohsidered full compensation <br />for the Basic Services outlined above, for assisting in the taking <br />and tabulating of bids and for reviewing the bids and submitting a <br />recommendation regarding award (See Section II, Paragraph H on Rebidding) <br />per diem rates <br />a. Less than $20,000.00 <br />b. $20,000.00 to $50,000.00 <br />8.5% <br />c. $50,000.00 to $100,000.00 <br />8.0% <br />d. $100,000.00 to $200,000.00 <br />7.5% <br />e. $200,000.00 to $500,000.00 <br />7.0% <br />f. $500,000.00 to $1,000,000.00 <br />6.0% <br />g. $1,000,000.00 and over <br />5.5% <br />The percentage rates apply to the lowest responsible bid unless a <br />portion of the work on which Engineering Services were performed is <br />deleted by the Owner prior to the taking of bids. If the latter <br />occurs, the percentage rates shall apply to the low bid and the <br />Engineers shall receive additional compensation for services <br />performed on the deleted portion of the work based on the Per Diem <br />-2- <br />