My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02-14-1979 Council Agenda
>
City Council Packets
>
1975-1979
>
1979
>
02-14-1979 Council Agenda
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/23/2013 2:35:55 PM
Creation date
4/23/2013 2:33:57 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
rates as set forth in Section II of this Agreement. If alternate or <br />deductive bidding is used, the basic or prime bid shall be considered <br />the highest alternate and the percentage rates shall apply to this <br />figure. <br />C. CANCELLATION <br />If any work is cancelled, in whole or in part, the percentage rates <br />shall not apply. The Engineer shall be paid for all work performed <br />up to such time as he is notified in writing of said cancellation, <br />based upon the Per Diem rates outlined in Section II of this Agreement. <br />SECTION II <br />OTHER PROFESSIONAL SERVICES <br />Certain services as described below may be ordered by the Owner and <br />performed by the Engineer for these services on the basis of an hourly <br />rate as follows: <br />Principal Engineer $ 31.00 <br />Chief Project Engineer 24.00 <br />Project Engineer 21.00 <br />Draftsman 20.00 <br />Survey Party - 3 man 52.00 <br />Survey Party - 2 man 36.00 <br />Surveyor 27.00 <br />Clerical 10:50 <br />These rates include all transportation, material, equipment, insurance <br />and overhead. <br />-3- <br />E2n,O <br />v1,^ :' <br />
The URL can be used to link to this page
Your browser does not support the video tag.