My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01-28-1987 Council Agenda
>
City Council Packets
>
1980-1989
>
1987
>
01-28-1987 Council Agenda
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2013 9:36:50 AM
Creation date
5/7/2013 9:35:50 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3. Two estimates are shown in this report. <br />The first estimate includes all streets <br />and utilities as shown with a dead end <br />watermain on Woodlyn at the Waterworks ROW. <br />The second estimate includes the looping <br />the Woodlyn watermain to So. Owasso Blvd. <br />following the sewer. <br />4. The cost of easements has been calculated at <br />$1.00 per square foot. <br />5. This report outlines more work than the Coun <br />envisioned, however, it must be pointed out <br />that the improvement may be reducted but <br />cannot be increased. <br />ESTIMATED COST: ESTIMATED NO. 1 - Woodlyn & Soo Lane Area <br />Construction $ 375,620.00 <br />Contingency 37,562.00 <br />Legal . . . 22,537.00 <br />Fiscal 18,781.00 <br />Administration 7,512.00 <br />Engineering 67,612.00 <br />529,624.00 <br />Capital Interest 52,962.00 <br />$ 582,586.00 <br />ESTIMATE NO. 2 - Watermain looped on East side Are <br />Construction $ 412,566.00 <br />Contingency 41,257.00 <br />Legal . . . 24,754.00 <br />Fiscal 20,628.00 <br />Administration 8,251.00 <br />Engineering 74,262.00 <br />581,718.00 <br />Capital Interest 58,172.00 <br />$ 639,890.00 <br />ESTIMATED EASEMENT COST $ 55,000.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.