Laserfiche WebLink
SANITARY SEWER <br />WATERMAIN - <br />STORM SEWER <br />COST ESTIMATES - WOODLYN -S00 LANE <br />Construction $ 90,230.00 <br />Contingency 9.023.00 <br />Legal . . . 5,413.00 <br />Fiscal 4,512.00 <br />Administration 1,804.00 <br />Engineering 16,241.00 <br />127,223.00 <br />Capital Interest 12,722.00 <br />TOTAL • • $ 139,945.00 <br />(LOOPED) <br />Construction . . . . $ 68,690.00 105,636.00 <br />Contingency . . . . 6,869.00 10,564.00 <br />Legal . . . . . . . 4,121.00 6,338.00 <br />Fiscal 3,435.00 5,282.00 <br />Administration • 1,374.00 2,113.00 <br />Engineering . • 12,364.00 19,014.00 <br />96,853.00 148,947.00 <br />Capital Interest . 9,685.00 14,895.00 <br />TOTAL . . $ 106,538.00 163,842.00 <br />Construction $ 73,700.00 <br />Contingency 7,370.00 <br />Legal 4,422.00 <br />Fiscal 3,685.00 <br />Administration . 1,474.00 <br />Engineering . . . . 13,266.00 <br />103,917.00 <br />Capital Interest . 10,392.00 <br />TOTAL $ 114,309.00 <br />STREET CONSTRUCTION Construction . . .$ 143,000.00 <br />Contingency . . 14,300.00 <br />Legal 8,580.00 <br />Fiscal 7,150.00 <br />Administration . 2,860.00 <br />Engineering . . . 25,740.00 <br />201,630.00 <br />Capital Interest 20,163.00 <br />TOTAL . . $ 221,793.00 <br />RECAP <br />Sanitary Sewer <br />Watermain <br />Storm Sewer <br />Street <br />UNLOOPED LOOPED % EASEMENT <br />139,945.00 24 (21) <br />106,538.00 (163,842.00 18 (25 <br />114,309.00 19 (18) <br />221,793.00 38 (34) <br />COST ESMT <br />13,000 (12000) <br />10,000 (14000) <br />11,000 (10000) <br />21,000 (19000) <br />582,585.00 (639,889.00) 55,000 55,000 <br />Page 12 <br />