My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10-28-1987 Council Agenda
>
City Council Packets
>
1980-1989
>
1987
>
10-28-1987 Council Agenda
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2013 1:15:58 PM
Creation date
5/8/2013 1:12:16 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
107
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
that by the total engineer's estimated construction costs for Bridge 62896. <br />5. In addition, said payment by the City shall also include an amount equal to the <br />City final total share of construction costs as determined in accordance with <br />Items 1, 2, 3 and 4 above multiplied by the City's prorated shares of the contract <br />costs of Items 2021.501 "Mobilization ", 2031.503 "Field Laboratory ", 2051.501 <br />"Maintenance and Restoration of Haul Roads" and 563.601 "Traffic Control ". The <br />formula by which said additional payment shall be determined is set forth in <br />said SCHEDULE 'I ". Said additional payment represents the City's proportionate <br />shares of the mobilization, field laboratory, maintenance and restoration of haul <br />roads and traffic control costs incurred in connection with the aforesaid City <br />cost participation construction. <br />6. In addition to payment of the aforesaid construction costs including the prorated <br />cost shares of "Mobilization ", "Field Laboratory ", "Maintenance and Restoration <br />of Haul Roads" and "Traffic Control ", the City shall pay to the County a prorated <br />share of the construction engineering costs for field engineering and inspection <br />which will be incurred by the State and paid by the County in connection with <br />said City cost participation construction. Such construction engineering costs <br />shall consist of charges made by state personnel assigned to said state projects <br />and of a classification no higher than "Principal Engineer" (Resident Engineers <br />assigned state district offices and placed in charge of construction projects are <br />classified as Principal Engineers) as recorded under the state construction cost <br />accounting work item code numbers appropriate for such construction engineering <br />activities on the "Time Report" (Form TC 30) and the "Cost Distribution" (Form <br />TC 32) forms. Said City prorated cost share shall be determined using the <br />method and formula set forth in said SCHEDULE "I ". <br />NOTE: For the purposes of estimating the City share of said construction engineering <br />costs as shown in the SCHEDULE "I" and SCHEDULE "J" construction cost <br />estimate form, an amount equal to 8 percent of the estimated amount computed <br />as the City's total share of the aforementioned construction costs which includes <br />the City cost shares of the items of "Mobilization ", "Field Laboratory ", <br />"Maintenance and Restoration of Haul Roads" and "Traffic Control ".) <br />ARTICLE IV - PAYMENT BY THE CITY <br />Section A. Estimate and Advancement of the City's Cost Share <br />It is estimated, for accounting purposes, that the County and City share of the costs <br />of the construction work to be performed by the State hereunder which includes the <br />City's shares of the prorated items "Mobilization ", "Field Laboratory ", " Maitenance and <br />Restoration of Haul Roads" and "Traffic Control" plus the 8 percent construction <br />engineering cost share (used for estimating purposes only) is the sum of $320,500.86 as <br />shown in the attached SCHEDULE "I ". The State shall, when a construction contract <br />is awarded which includes the County and City cost participation construction work to <br />be performed hereunder, prepare a revised SCHEDULE "I" based on the construction <br />contract unit prices and submit a copy of said revised SCHEDULE "I" to the County. <br />The County agrees to advance to the Commissioner of Transportation an amount equal <br />to the City and County total cost share as set forth in said revised SCHEDULE "I" be <br />it more or less than said sum of $320,500.86 forthwith upon the execution of Agreement <br />62715 and upon receipt of a request from the State for such advancement of funds. <br />The County shall prepare a revised SCHEDULE "J" based on the revised SCHEDULE <br />"I" construction contract unit prices and submit a copy of said revised SCHEDULE "J" <br />Page 95 <br />87022 <br />Page 5 of 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.