Laserfiche WebLink
1501.070. COMPLETION OF OPERATION. At the completion of a land fill <br />operation the premises shall be graded, levelled, and seeded or sodded with <br />grass. The grade shall be such elevation with reference to any abutting street <br />or public way as the Engineer shall prescribe in the permit. The site shall <br />also conform to such prerequisites as the Engineer may determine with reference <br />to storm water drainage run -off and storm water passage or flowage so that the <br />land fill cannot become a source of, or an aggravation to, storm water drainage <br />conditions in the area. The Engineer shall inspect the project following <br />completion to determine if the applicant has complied with the conditions <br />required of him. Failure of such compliance shall result in the withholding of <br />any building permits for the site and notice of such withholding shall be filed <br />in the office of the County Recorder for the purpose of putting subsequent <br />purchasers on notice." <br />Section 2. This ordinance shall take effect and be in force from and <br />after its passage and publication. <br />Passed by the Council of the City <br />of Little Canada this 10 day <br />of September , 1980. <br />Attest: <br />ler <br />Ayes - 5 <br />Nays - 0 <br />