My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03-11-1981 Council Agenda
>
City Council Packets
>
1980-1989
>
1981
>
03-11-1981 Council Agenda
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/15/2013 2:46:40 PM
Creation date
5/15/2013 2:45:15 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
108
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
rates as set forth in Section II of this Agreement. If alternate <br />or deductive bidding is used, the basic or prime bid shall be <br />considered the highest alternate and the percentage rates shall <br />apply to this figure. <br />C CANCELLATION <br />If any work is cancelled, in whole or in part, the percentage <br />rates shall not apply. The Engineer shall be paid for all work <br />performed up to such time as he is notified in writing of said <br />cancellation, based upon the per diem rates outlined in <br />Section II of this Agreement. <br />SECTION II <br />OTHER PROFESSIONAL SERVICES <br />Certain services as described below may be ordered by the Owner <br />and performed by the Engineer for these services on the basis <br />of an hourly rate as follows: <br />Principal Engineer $ 38.00 <br />Chief Project Engineer 29.00 <br />Project Engineer 25.00 <br />Draftsman 24.00 <br />Registered Surveyor 33.00 <br />Survey Party - 3 Man 65.00 <br />Survey Party - 2 Man 48.00 <br />Clerical 12.00 <br />These rates include all transportation, material, equipment, <br />insurance and overhead. <br />-3- <br />
The URL can be used to link to this page
Your browser does not support the video tag.