My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-26-1982 Council Agenda
>
City Council Packets
>
1980-1989
>
1982
>
05-26-1982 Council Agenda
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/21/2013 12:52:23 PM
Creation date
5/21/2013 12:50:46 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
90
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Agreement No. 60962 <br />ADJUST its facilities, together with all appurtenances thereto, in accordance with <br />applicable codes, the following terms and conditions and in the following manner: <br />PERFORM all work to the satisfaction of the State's Field Engineer, hereinafter <br />referred to as the "Engineer ", and the State's Utilities Engineer before final payment is <br />rnade by the State. <br />STAKE within the limits of the trunk highway right of way, the location of the <br />proposed facility and have such location approved by the Engineer prior to actual <br />construction. <br />REPORT each day's work on the project to the Engineer on the State's Form 21191, <br />Daily Utility Report, or on a form acceptable to the State and submit such report to the <br />Engineer not later than the day following the date the work was performed. Inasmuch as <br />this Agreement provides for a "lump -sum" payment after satisfactory relocation or <br />adjustment of the involved utility facilities, the Daily Utility Report may omit items of <br />hours, materials and equipment. <br />COMMENCE its adjustment within two weeks after receipt of written notice from <br />the Engineer to commence. All such operations shall be under the direction of the Engineer <br />and shall be coordinated with the highway contractor's operations. The Utility shall notify <br />the Engineer two days prior to commencing each phase of the work operations and shall also <br />notify him upon completion of each phase of the work operations. <br />PERFORM the adjustment as shown on Exhibit "A" for the herein agreed upon <br />reimbursable lump sum of Two Thousand Four Hundred Forty Nine and 44/100 Dollars <br />($2,449.44). Attached hereto, marked Exhibit "B" and made a part hereof, is a detailed and <br />itemized estimate of the cost of the work to be performed by the Utility in adjusting said <br />facilities. <br />
The URL can be used to link to this page
Your browser does not support the video tag.