Laserfiche WebLink
PROPOSED ASSESSMENTS: <br />Alternate, Con't <br />Capital interest <br />TOTAL <br />FOR INFORMATION: <br />APPROXIMATE COST OF PLACING WATERMAIN FROM <br />INT. LABORE & ARCADE TO CARLA LANE: <br />24,500.00 <br />2,450.00 <br />26,950.00 <br />Approximate Construction <br />Contingency <br />Legal <br />Fiscal <br />Administration <br />Engineering <br />Capital interest <br />TOTAL <br />325,000.00 <br />32,500.00 <br />16,250.00 <br />16,250.00 <br />6,500.00 <br />58,500.00 <br />455,000.00 <br />45,500.00 <br />500,500.00 <br />APPROXIMATE COST OF PLACING WATERMAIN FROM <br />CARLA LANE TO CO. RD. B2: <br />Approximate Construction 209,788.00 <br />Contingency 20,979.00 <br />Legal 10,489.00 <br />Fiscal 10,489.00 <br />Administration 4,196.00 <br />Engineering 37,762.00 <br />293,703.00 <br />Capital interest 29,370.00 <br />TOTAL 323,073.00 <br />Lots served by water 28 <br />Cost per lot <br />Lots served by street 25 <br />Cost per lot <br />Page 10 <br />8,826.00 <br />6,649.00 <br />