Laserfiche WebLink
FEASIBILITY: <br />FINANCING: <br />It has been our opinion that water could <br />be most economically obtained from <br />Maplewood in Palm Court directly across <br />the street from Carla Lane. <br />Although Little Canada and Maplewood both <br />obtain water from the City of St. Paul, <br />the two cities have different agreements <br />with St. Paul. We have been in discussion <br />with Maplewood concerning this possibility <br />and they are at present studying the <br />connection of water into Palm Court. <br />4. Because of the poor soil conditions we <br />have anticipated additional base material <br />in order to support the street and concrete <br />curb and gutter. However, we would not <br />recommend proceeding without adequate soil <br />boring information. <br />This project is feasible even though it is <br />more expensive than similar improvements <br />elsewhere in the City. The lots on Carla <br />Lane are probably much more expensive than <br />elsewhere. <br />STREET <br />Approximate Construction cost <br />Contingency <br />Legal <br />. Fiscal <br />Administration <br />Engineering <br />Capital interest <br />TOTAL <br />WATERMAIN <br />Approximate Construction cost <br />Contingency <br />Legal <br />Fiscal <br />Administration <br />Engineering <br />Capital interest <br />TOTAL <br />(ALTERNATE) <br />STREET OVERLAY 2" MAT <br />Construction <br />Contingency <br />Legal <br />Fiscal <br />Administration <br />Engineering <br />Page 9 <br />107,950.00 <br />10,795.00 <br />5,398.00 <br />5,398.00 <br />2,159.00 <br />19,431.00 <br />151,131.00 <br />15,113.00 <br />166,244.00 <br />160,473.00 <br />16,047.00 <br />8,024.00 <br />8,024.00 <br />3,210.00 <br />28,885.00 <br />224,663.00 <br />22,466.00 <br />247,129.00 <br />17,500.00 <br />1,750.00 <br />875.00 <br />875.00 <br />350.00 <br />3,150.00 <br />24,500.00 <br />