Laserfiche WebLink
PROPOSED FEE SCHEDULE FOR ELECTRICAL PERMITS <br />(A) Minimum fee for each separate inspection of an installation, <br />replacement, alteration or repair limited to one inspection <br />only $40790 $15.00 <br />(B) Services, changes of service, temporary services, additions, <br />alterations, or repairs on either primary or secondary ser- <br />vices shall be computed separately: <br />0 to 100 ampere capacity $45799 $18.00 <br />101 to and including 200 ampere capacity $48799 $22.00 <br />For each additional 100 ampere capacity <br />or fraction thereof $ -8 -99 $10.00 <br />(C) Circuits, installations of, additions, alterations, or <br />repairs of each circuit or sub - feeder shall be computed <br />separately, including circuits fed from sub - feeders and <br />including the equipment served, except as provided for in <br />(D) through (K): <br />0 to and including 30 ampere capacity $ -4:99 $ 5.00 <br />(Maximum number of 0 to 30 ampere circuits <br />to be paid on is 30 to any one cabinet) <br />31 to and including 100 ampere capacity $ -6 -99 $ 7.00 <br />For each additional 100 ampere capacity or <br />fraction thereof $ -3 700 $ 4.00 <br />(D) Maximum fee on a single family dwelling shall not exceed $69799 <br />$75.00 if not over 200 ampere capacity. This includes service, <br />feeders, circuits, fixtures and equipment. The maximum fee pro- <br />vides for not more than two rough -in inspections and the final <br />inspection per dwelling. Additional inspections at the rein - <br />spection rate. <br />(E) <br />(F) <br />Maximum fee on an apartment building shall not exceed $39 700 <br />$35.00 per dwelling unit for the first 20 units and $25:90 <br />$30.00 per dwelling unit for the balance of the units. A <br />two -unit dwelling, (duplex) maximum fee per unit as per <br />single family dwelling. <br />The maximum number of 0 to 30 ampere circuits to be paid <br />on any one athletic field lighting standard is ten. <br />(G) In addition to the above fees: <br />(1) <br />A charge of $4709 $2.00 will be made for each street <br />lighting standard. <br />(2) A charge of $2790 $3.00 will be made for each traffic <br />signal standard. Circuits originating within the <br />standard will not be used when computing fees. <br />(H) In addition to the above fees, all transformers and <br />generators for light, heat, and power shall be computed <br />separately at $5 799 $6.00 per unit plus 250 300 per KVA <br />up to and including 100 KVA. 101 KVA and over at 290 250 <br />per KVA. The maximum fee for any transformer or generator <br />in this category is $50709 $60.00. <br />Page 39 <br />