My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11-14-1984 Council Agenda
>
City Council Packets
>
1980-1989
>
1984
>
11-14-1984 Council Agenda
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/24/2013 2:44:55 PM
Creation date
6/24/2013 2:43:09 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-2- <br />The local share of the bridge reconstruction, $5,760.00, would be funded <br />by Little Canada. <br />Little Canada Road is a CSAH road, eligible for CSAH funding, and assuming <br />Centerville Road and Racine Drive are eligible for CSAH funding, Little Canada <br />will be requested to pay: <br />Storm Sewer <br />Concrete Curb and Gutter <br />Bridge Participation <br />Also, all right of way costs <br />for the project would be borne <br />by the City. <br />The total estimated construction <br />cost, excluding right of way, is <br />(See attached sheet.) <br />In summary, cost participation <br />would be: <br />Little Canada <br />Ramsey County, Road and Bridge <br />For Bikeways <br />For Signals <br />Ramsey County, CSAH Funds <br />$12,767.50 <br />17,820.00 <br />5,760.00 <br />$36,347.50 <br />$302,652.00 <br />$36,347.50 <br />$6,572.00 <br />$25,000.00 <br />$234,732.50 <br />$302,652.00 <br />As the project develops, we can more accurately estimate the cost participation. <br />Exact costs cannot be determined until a contract is awarded, and costs can be <br />calculated on the contractor's unit prices. <br />Kenneth E. Weltzin, P.E. <br />Director and County. Engineer <br />kew:js <br />Att. <br />0 il <br />
The URL can be used to link to this page
Your browser does not support the video tag.