Laserfiche WebLink
BID PROPOSAL <br />ITEM NO. <br />DIAMETER UNIT PRICE <br />(in inches) (per tree) <br />Over To <br />13 38 30 - $ « ?t2 ,c ;- ?,5— <br />14 30 32 $ fc23, S?C. <br />15 32 34 $ ,,:Q.3 /, / <br />16 34 36 $ (J(), C , <br />17 36 38 $ .3 FO, cc, <br />18 38 40 $ ' CO. C` ZO <br />19 40 42 $ 41,2C1,Cc <br />20 42 44 1 $ ' 72C', CC <br />21 44 46 $ ` /,C, C C <br />22 46 48 $ /21; 'i (? 0 <br />B. Sod <br />23 Furnish and place one (1) <br />square yard sod <br />C. Haul (See Spec. 41e) <br />Haul from site one (1) Truck <br />Load (Min. 10 c.y. per load) <br />D. Haul, no drop charge (See Spec. 41h) <br />E. What percent may be subtracted from unit price <br />(per tree) if no drop charge (See Spec. 41h) <br />$ - '2U ('C1 <br />$ <br />$ ..< Cr) <br />$ /n <br />