My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01-11-1989 Council Agenda
>
City Council Packets
>
1980-1989
>
1989
>
01-11-1989 Council Agenda
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/8/2014 1:48:49 PM
Creation date
6/26/2013 11:44:03 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FEASIBILITY REPORT <br />IMPROVEMENT 88 -23 <br />CITY OF LITTLE CANADA, MINNESOTA <br />RE_CEIVE� \ \\\ <br />JAN 5 »as \ .. <br />fI� City of <br />G, Little Canada <br />LOCATION: Eli Road at Little Canada Elementary <br />School <br />NATURE OF IMPROVEMENT: Grading, storm sewer, concrete curb and <br />gutter, concrete sidewalk, bituminous <br />pavement of new driveways and parking <br />areas. <br />INITIATION: Petition <br />RIGHT OF WAY: Improvements are to be constructed on <br />School District property. <br />EASEMENTS: <br />SPECIAL CONDITIONS: <br />1/ <br />Oi 6? <br />It has not been determined at this writing <br />whether or not easements are required. <br />However, in view of the fact that the <br />School District is the sole petitioner and <br />also the sole beneficiary of the improvement; <br />it is assumed that if easements are required, <br />they will be granted by the School District <br />at no charge to the City. <br />This project is being undertaken by the <br />City of Little Canada in conjunction with <br />the construction of an addition to the <br />school in which the City is also participating. <br />Therefore, timing and coordination is <br />important. <br />The driveways and parking areas to be <br />constructed are adjacent to and parallel <br />with Eli Road. The storm sewer will flow <br />east under the driveway to the east edge <br />of the school property. and thence south to <br />Gervais Creek. <br />The project will eliminate a large washout <br />existing at the foot of the bank. <br />No work is planned for the parking area <br />west of the building. This area will remain <br />as is. <br />FEASIBILITY: This project is feasible. <br />PAGE •14- <br />
The URL can be used to link to this page
Your browser does not support the video tag.