Laserfiche WebLink
FINANCING: ESTIMATED COST PARKING - SIDEWALK <br />Excavation 2,000 CuYd $ 2.50 <br />Base Aggregate <br />(CL5A) 8" 800 Ton 10.00 <br />Bit. Base 1}" 2331 300 Ton 27.00 <br />Bit. Wear 1i" 2341 300 Ton 28.00 <br />Conc. Curb & Gutter <br />B6 -18 850 L.F. 6.00 <br />Sidewalk 8' Wide 4,000 SqFt 2.30 <br />ESTIMATED COST STORM SEWER <br />30" RCP <br />24" RCP <br />21" RCP <br />18" RCP <br />30" Surge Basin <br />24" Apron with T/G <br />Catch Basin w /Curb <br />Casting <br />Catch Basin LP <br />Manhole <br />Remove Existing CB <br />Seeding <br />150 L.F. 40.00 <br />755 L.F. 34.00 <br />130 L.F. 32.00 <br />45 L.F. 30.00 <br />1 Ea. 1000.00 <br />1 Ea. 850.00 <br />4 Ea. 1300.00 <br />1 Ea. 1500.00 <br />1 Ea. 1500.00 <br />Lump Sum <br />1 Ac. 1500.00 <br />TOTAL <br />TOTAL CONSTRUCTION <br />$5,000.00 <br />8,000.00 <br />8,100.00 <br />8,400.00 <br />5,100.00 <br />9,200.00 <br />$43,800.00 <br />6,000.00 <br />25,670.00 <br />4,160.00 <br />1,350.00 <br />1,000.00 <br />850.00 <br />5,200.00 <br />1,500.00 <br />1,500.00 <br />3,000.00 <br />1,500.00 <br />$51,730.00 <br />$95,530.00 <br />Construction $95,530.00 <br />Contingency 10% 9,553.00 <br />Legal 6% 5,732.00 <br />Fiscal 6% 5,732.00 <br />Administration 2% 1,911.00 <br />Engineering 18% 17,195.00 <br />TOTAL $135,653.00 <br />Capital Interest 10% 13,565.00 <br />GRAND TOTAL <br />PAGEā€¢15- <br />$149,218.00 <br />