My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-12-1989 Council Agenda
>
City Council Packets
>
1980-1989
>
1989
>
04-12-1989 Council Agenda
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/8/2014 2:11:10 PM
Creation date
6/26/2013 11:58:27 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
In the event it is found necessary to excavate to say 20 feet instead <br />of 10 feet, the cost of soil correction could triple. <br />The estimates listed below are for a shelter for 150 people and 400 <br />people which is close to the total population. Some type of ventilation <br />and lighting would be required also. <br />SMALL 12' X 54' <br />(150 Person) <br />Soil Correction <br />Material <br />Erection <br />Contingency (20 %) <br />$11,651 <br />19,046 <br />5,713 <br />$36,410 <br />7,282 <br />$43,692 <br />LARGE 1,600 Sq. Ft. 12' X 132' (400 Person) <br />Soil Correction <br />Material <br />Erection <br />Contingency (20%) <br />$23,366 <br />39,047 <br />11,714 <br />$74,127 <br />14,825 <br />$88,952 <br />NOTE: DOES NOT INCLUDE LIGHTING AND VENTILATION. <br />Yours truly, <br />Donald 0. Carley, <br />Vice President <br />DOC /kt <br />Page 15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.