Laserfiche WebLink
-2- <br />would want to sample seasonally, before and after the park <br />construction. <br />We would notify your designated agent before any trip to the <br />site, stay away from construction areas and equipment, and assume <br />all liability for our actions. The data obtained from the park <br />site would be lumped together with data from the other research <br />sites in the metro area. Our work is not connected to state or <br />federal regulation in any way and will in no way affect your <br />ability to obtain permits. <br />We look forward to hearing from you. Please contact us <br />immediately if we can provide any further information. If we are <br />able to include the park site in our sampling framework it would <br />be best if we could obtain permission in time to collect samples <br />during the snow melt season, since this is one of the major <br />inflow periods. Thank you for your consideration of this matter. <br />Sincerely, <br />Debra L. Taylor <br />AScI, Inc. <br />6201 Congdon Blvd. <br />Duluth, MN 55804 <br />218 - 720 -5755 <br />Page 29 <br />