My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-28-1989 Additions
>
City Council Packets
>
1980-1989
>
1989
>
06-28-1989 Additions
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/26/2013 1:02:52 PM
Creation date
6/26/2013 1:02:39 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ramsey - Washington "letro <br />District <br />PERMIT <br />2223 White Bear Ave., <br />Maplewood, Mn. 55109 <br />19121779. 2207 <br />Permission is granted to conduct grading operations in accordance with <br />the Rules and Regulations and Management Plan of the District for the <br />project County Ditch 16 Ernrm Sewer <br />owned by City of Little Canada , District Permit No. 89 -21 <br />subject to the following special provisions: <br />10. All storm sewer catch basins which are not necessary for site drainage <br />during construction shall be covered to prevent runoff from entering the <br />storm sewer system. Where storm sewer catch basins are necessary for <br />site drainage during construction a silt fence or double ring of staked <br />hay bales backed by snow fence shall be installed and maintained around <br />all catch basins until the area tributary to the catch basins is <br />restored. <br />11. An overflow swale shall be constructed from the top of the ravine to the <br />catch basin adjacent to the walkway. The centerline of the swale shall <br />be at least 1 foot lower than the top of the side banks, "Enkamat" <br />erosion control material shall be installed within this swale the entire <br />length a minimum of 15 feet wide. <br />12. All silt fence shall be backed by snow fence for additional support. <br />13. The District Administrator, Cliff Aichinger (779- 2207), shall be <br />notified of the pre — construction meeting so that attendance at the <br />meeting can be arranged. <br />2362031 /LCP /sam <br />The Board reserves the right to review and revise these spacial provisions <br />as circumstances may require. This permit may be suspended for failure to <br />comply with the above specified provisions. <br />Approved April 5 , 19ja. <br />RAMSEY- WASHINGTON METRO WATERSHED DISTRICT <br />President <br />Signature Title <br />Page 11 <br />NOTE: THE GRANTING OF THIS PERMIT IN NO WAY PURPORTS TO PERMIT ACTS WHICH MAY BE PROHIBITED BY <br />OTHER GOVERNMENTAL AGENCIES. <br />
The URL can be used to link to this page
Your browser does not support the video tag.