Laserfiche WebLink
Ramsey - Washington " letro <br />District <br />PERMIT <br />2225 White Bear Ave., <br />Maplewood, Mn. 55109 <br />18121779- 2207 <br />Permission is granted to conduct grading operations in accordance with <br />the Rules and Regulations and Management Plan of the District for the <br />project County Ditch 16 Storm Sewer <br />owned by City of Little Canada , District Permit No. 89-21 <br />subject to the following special provisions: <br />1. Construction shall be in accordance with the plans submitted to the <br />District as of April 5, 1989. <br />2. The site soil erosion and sediment control facilities shall be installed <br />and maintained to conform with the Ramsey - Washington Metro Watershed <br />District standards as detailed in the enclosed "Attachment A ". <br />3. The site erosion and sediment control facilities shall be installed <br />prior to any site grading operations. The District's Administrator must <br />be notified upon completion of the installation of the required erosion <br />control facilities. Grading operations shall not commence until the <br />District Administrator approved the installed facilities. <br />4. All grading operations shall be conducted in a manner to minimize the <br />potential for site erosion. <br />5. In areas where concentrated volumes of stormwater will occur (such as <br />swales, in front of storm sewer catch basins and intakes, etc.), the <br />erosion control facilities shall be backed by a snow fence or other <br />district engineer approved stabilization structure to prevent the <br />destruction of the erosion control facilities by concentrated flows. <br />6. Any damaged silt fencing or other erosion control facilities shall be <br />restored to their originally installed condition daily. <br />7. Restoration of all areas disturbed during construction shall be <br />completed as soon as possible. Any areas which have been finish graded <br />or areas that have been disturbed and for which other grading or site <br />building construction operations are not actively underway shall be <br />seeded and mulched within 14 days. All mulch material shall be disced <br />into the soil in a direction perpendicular to the storm water flow over <br />such areas. <br />8. All soils tracked onto paved roadways shall be removed from those <br />roadways daily. <br />9. All construction site entrances shall be surfaced with crushed rock <br />across the entire width of the entrance, from the entrance to a point <br />not less than 50 feet into the construction zone. <br />The Board reserves tM right to review and revise these special provisions <br />as circumstances may require. This permit may be suspended for failure to <br />comply with the above specified provisions. <br />Approved Apri 1 5 , 19 89 . <br />RAMSEY- WASHINGTON METRO WATERSHED DISTRICT <br />President <br />Signatur Titta <br />Page 10 <br />NOTE: THE GRANTING OF THIS PERMIT IN NO WAY PURPORTS TO PERMIT ACTS WHICH MAY BE PROHIBITED BY <br />OTHER GOVERNMENTAL AGENCIES. <br />