My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10-24-1990 Additions
>
City Council Packets
>
1990-1999
>
1990
>
10-24-1990 Additions
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/19/2013 9:27:46 AM
Creation date
7/19/2013 9:26:14 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
11.2.1 Continued <br />FOR BASIC SERVICES, as described in Article 2, and any other services included in Article 12 as <br />part of Basic Services, Basic Compensation shall be computed as follows: <br />The Architect shall receive hourly compensation not to exceed a fixed maximum based on a <br />percentage of the total cost of construction as included in the architect's work. Hourly rates shall <br />be stated in 14.4.1. The owner will be credited the Part 1, Partial Schematic Design Fee, toward <br />the total project fee. <br />PROJECT 1: Fire Station (New Construction) <br />The lesser of: <br />(Maximum Fees) <br />-7% of construction + $2,000 maximum for reimbursables (printing and travel) based on <br />actual costs + % for major bid alternates. based on Section 11.2.2. <br />or <br />— $79,765 + $2,000 maximum for reimbursables (printing and travel)- <br />on actual costs + % for major bid alternates based on fln�'iti.'"�(! <br />Section 11.2.2. <br />PROJECT 2: City Hall (Exoansion and Remodeling) (Maximum Fees) <br />The lesser of: <br />-8% of constriction +$2,000 maximum for reimbursables (printing and travel) based <br />actual costs + % for major bid alternates. based on Section 11.2.2 <br />or <br />$33,600 + $2,000 maximum for reimbursables (printing and travel) <br />based on actual costs + % for major bid alternates based on Section 11.2.2. <br />*Major bid altemates would be those requiring a change in construction drawings. <br />Hourly rates for Phase I and II shall be as stated: <br />Hourly Rates <br />David Kroos /Jack Boarman Project Principal $75 <br />Paul MIckelberg Project Manager $54 <br />Jerry DeZelar Project Architect $60 <br />Rick Houts Project Architect $48 <br />Paul Roitenberg Mechanical Engineer $70 <br />Mike McGie Electrical Engineer $60 <br />Vicky Johnson Interior Design $48 <br />Page 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.