Laserfiche WebLink
11.5.3 The rites and mutt ip les .set forth for Acidic it Services shall he annu ally adjusted in accordance with ormal salary review <br />— <br />practices of the Architect. Hi <br />11.5.4 IF THE SERVICES, covered by this Agreement have not been completed by January 1, 1 through ault <br />of the Architect, the hourly rates setfarth herein shall be adjusted. The maximum amounts shall remain unless adjusted <br />with Owner's approval. <br />ARTICLE 12 <br />OTHER CONDITIONS OR SERVICES <br />(Mart elect rlfnhant u/ other sm,Nr'n. /drn/Hr Mentioned .S rNnx im'hnlwl widget lbtde r.)nn/nrmnhw and mmwli/irnmmnr In the )'.('melt nml (0 mlrnvtthan ternn <br />Included in Mir Agreement) <br />12.1 Should the Owner decide to retain a construction manager in lieu of a General Contractor, <br />the Owner will not be charged additional services by the Architect as stated in Section <br />3.3.2 and 3.4.9. <br />12.2 Notwithstanding anything to the contrary in the Agreement, Owner acknowledges and <br />consents to Architects assignment of all its right to receive payments under the Agreement <br />to First Bank National Association. However, Owner shall make all payments under the <br />Agreement to ARchitect until otherwise notified in writing by First Bank National <br />Association. <br />12.3 The Architect shall incorporate the work completed in the Needs Assessment Study into <br />the subsequent phases of work described in this contract <br />12.4 . The Architect shall provide without cost to the Owner a certificate of $1,000,000.00 errors <br />and omissions insurance. <br />12.5 The Architect will provide two separate cost estimates to be completed by an independent <br />contractor, ane at the conclusion of design development, the other just prior to bidding <br />the construction documents. If the City retains a construction manager, cost estimates will <br />be the responsibility of the construction manager per the standard Owner /Construction <br />Manager Agreement. <br />12.6 Construction Documents - The owner agrees to pay for the preparation of bid altemates <br />based on the fee percentage. Bid altemates would be reimbursable based on 80% of <br />normal percentages (80% x 7% for Fire Station or 80% x 8% for City hall) applied against <br />bid amount if not constructed and 100% of normal fees (7% Fire Station or 8% for City <br />Hall) if constructed. <br />12.7 The interior design services as described in Section 3.4.13 are included as part of the <br />Architects basic services. <br />12.8 For the City Hall project, the City will make decision to proceed with project after <br />completion of schematic phase of architectural services. At this time, the architect will <br />fumish the City Council with estimates of construction cost and schematic drawings. If the <br />City chooses not to proceed with construction, the City will reimburse Boarman & <br />Associates a maximum of $5,040 (15% x 33,600) for all services rendered in connection <br />with this project exclusive of soil testing and surveying costs. <br />This Agrcerncrite'ntered into as of the day and year first written love. <br />OWNER City of Little Canada <br />AItCI it <br />4 • n : Associates, Inc. <br />Mv& 1 <br />(See t <br />Ire) <br />(Segment <br />'Y <br />Michael. I. Fahey, Mayor Jack Boarman <br />N'ri Primed mime (1414/ lido) <br />Page 11 <br />laid MOM. ruin Ii0r1 <br />AIA DOCt161Et? 0141 • (R'NI.R.ARrafTGCI' AG IIrEAIIiN'I' • IrOVRTVENTH RbrrinN •MA's • °)I9H' <br />TI It A %IIiUICAN INs1ITIITI! nP .MCI IITIfCr\• I',SC NNW YORK AVI NIIl, NV., WASHINGTON, U.C, 204)16 <br />8141 -1987 10 <br />