My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07-25-1990 Council Agenda
>
City Council Packets
>
1990-1999
>
1990
>
07-25-1990 Council Agenda
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/16/2014 9:53:00 AM
Creation date
7/19/2013 2:18:29 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
123
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
* Survey cross section work is needed to determine extent of grading and <br />to verify locations for excess material. <br />* Sandy Amich's lot is need of extra fill material. <br />4. * Tree is half dead and is in the ditch line. The city could remove it. <br />5. * Drainage ditch may not be within the easement. (Appears to be pushed <br />onto the west side properties.) <br />* Tree line is on the property line. <br />* City may need easements extended to the west to correct the situation <br />otherwise trees must be removed. <br />6. * Two property owners have placed a cmp culvert for drainage and have <br />filled in the ditch. <br />* City may need easements extended to the west. <br />* Some fences are on property line and some are on the easement line. <br />7. * Ditch line may not require perforated pipe. <br />* This area drains well, but the ditch is not maintained. <br />We present the following recommendations for your consideration. <br />* Survey critical elevations of the culvert inverts and length of the <br />ditches to determine optimum grade of the ditch. Determine the profile <br />of the existing ditch and cross section areas where extensive grading is <br />required. <br />* Determine whether or not the existing and proposed ditch lies within the <br />ditch easement or if the easement needs to be extended. <br />* Determine policy for placement of storm sewer in order to fill in the <br />ditch. <br />* Determine policy for fence placement and replacement within drainage <br />easements. <br />* Consider the placement of perforated pipe to remove standing water in <br />order to dry out the ditch area so that residents can keep the ditch <br />maintained. <br />* Review existing storm sewer intakes for safety and performance. <br />* Determine a policy for removal of trees in ditch line that inhibit sur- <br />face drainage. <br />* Determine an assessment policy for placement of improvements or mainte- <br />nance of the ditch. <br />Page 2. <br />Page 89 <br />
The URL can be used to link to this page
Your browser does not support the video tag.