My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-26-1990 Additions
>
City Council Packets
>
1990-1999
>
1990
>
09-26-1990 Additions
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/19/2013 3:06:45 PM
Creation date
7/19/2013 3:05:54 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CHANGE ORDER NO. 3 (Revised) <br />Owner: <br />City of Little Canada <br />515 East Little Canada Road <br />Little Canada, MN 55117 <br />Contractor: <br />BE CONSTRUCTION, LTD. <br />P. O. Box 219 <br />Lake Elmo, MN 55042 <br />For: <br />Initiation Date: 9 -7 -90 <br />Contract Date: 5 -9 -90 <br />Architect: <br />RVK Architects <br />355 Kellogg Blvd <br />St. Paul, MN 55101 <br />Pioneer Park Concession Building <br />2886 Centerville Road <br />Little Canada, MN 55117 <br />THE CONTRACT FOR CONSTRUCTION SHALL BE CHANGED AS FOLLOWS: <br />Excavate earth, and place fill in area where berm is to be built at <br />$ 1.75 per cubic yard, import fill sand to the site at $ 4.50 per <br />cubic yard, and place and compact fill sand in excavation at $ 2.00 <br />per cubic yard. All work as directed by the soils engineer <br />employed by the owner, or where directed by the City of Little <br />Canada. Total cost of labor & material per Cubic Yard: $ 8.25 <br />1. Soil Correction At West Pier: 7.20 Cubic Yards <br />2. Soil Correction At East Pier: 13.20 Cubic Yards <br />3. Sand Cushion Under Sewer Service: 15.60 Cubic Yards <br />4. Sand Cushion Under Water Main: 9.60 Cubic Yards <br />5. Water Main Excavation Oversize: 118.40 Cubic Yards <br />6. Irrigation Pipe Sand: 54.50 Cubic Yards <br />Total Additional Material 218.50 Cubic Yards <br />Extra Subcontract Material: <br />218.50 Cubic Yards @ $ 8.25 = $ 1,802.62 <br />Subcontractor's 15 % OH & P = $ 270.39 <br />Total Extra By Subcontractor $ 2,073.01 <br />10 % OH & P $ 207.30 <br />TOTAL THIS CHANGE ORDER ADD <br />PREVIOUSLY AUTHORIZEDAND PAID <br />$ 2,280.31 <br />$ 1,982.88 <br />TOTAL THIS CHANGE ORDER $ 297.43" <br />NOTE: Balance due per Construction Specification Document 00800 <br />- Supplementary Conditions, 1.13 Changes In the Work, <br />Paragraph 7.3.11. <br />CONTRACT TIME EXTENSION: <br />CONTRACTOR: <br />TWO WORKING DAYS <br />Page 13 <br />OWNER: <br />
The URL can be used to link to this page
Your browser does not support the video tag.