Laserfiche WebLink
Owner: <br />CHANGE ORDER <br />City of Little Canada <br />515 East Little Canada Road <br />Little Canada, MN 55117 <br />Contractor: <br />BE CONSTRUCTION, LTD. <br />P. O. Box 219 <br />Lake Elmo, MN 55042 <br />For: <br />Pioneer Park Concession Building <br />2886 Centerville Road <br />Little Canada, MN 55117 <br />Initiation Date: 8 -7 -90 <br />Contract Date: 5 -9 -90 <br />Architect: <br />RVK Architects <br />355 Kellogg Blvd <br />St. Paul, MN 55101 <br />Contract Date: 5 -990 <br />THE CONTRACT FOR CONSTRUCTION SHALL BE CHANGED AS FOLLOWS: <br />Labor and materials to install low pressure cut off switch, two (2) <br />back flow preventers, and 4" M &H check valve level spring flanged <br />as require by the Minnesota Department of Health. <br />Labor & Material Marque Plumbing <br />Labor & Material EFS <br />Total Subcontractors <br />Contractor's 10% OH & P <br />TOTAL THIS CHANGE ORDER ADD <br />$ 2,341.00 <br />$ 205.00 <br />$ 2,546.00 <br />$ 254.60 <br />$ 2,800.60 <br />See attachments from Marque Plumbing and Electric Fire & Security, <br />which are a part of this Change Order. <br />CONTRACT TIME EXTENSION: NONE <br />CONTRACTOR: <br />BE CONSTRUCTION, LTD. <br />CANADA <br />ARCHIT <br />RV ''CHI <br />ECTS <br />Page 14 <br />OWNER: <br />CITY OF LITTLE <br />