Laserfiche WebLink
control and interface equipment). <br />Anticipated Federal —aid share is 90 percent. <br />Anticipated State's share is 5 percent. <br />Roseville's share is 1.66 percent. <br />Maplewood's share is 1.67 percent. <br />Little Canada's share is 1.67 percent. <br />e. Trunk Highway No. 49 (Rice Street) at Trunk <br />Highway No. 36 South Ramps. System "E ". <br />S.P. 6214 -63. Revise the existing traffic control <br />signal with street lights and emergency vehicle <br />pre — emption. <br />1. Traffic Control Signal. Estimated <br />Construction Cost is $24,330.00 which: <br />1) includes State furnished materials <br />(excluding EVP System control and interface <br />equipment) and 2) excludes EVP System <br />materials (cable, detectors and lights). <br />Anticipated Federal —aid share is 90 percent. <br />Anticipated State's share is 10 percent. <br />2. EVP System. Estimated Construction Cost is <br />$7,500.00 which includes: 1) EVP System <br />materials (cable, detectors and lights) and <br />2) State furnished materials (EVP System <br />69107 <br />— 10 — <br />Page 26 <br />