Laserfiche WebLink
materials (cable, detectors and lights) and <br />2) State furnished materials (EVP System <br />control and interface equipment). <br />Roseville's share is 50 percent. Maplewood's <br />share is 50 percent. <br />d. Trunk Highway No. 49 (Rice Street) at County Road <br />B. System "D ". S.P. 6214-63. S.P. 62- 625 -20. <br />Remove the existing traffic control signal and <br />install a new traffic control signal with street <br />lights and emergency vehicle pre - emption. <br />1. Traffic Control Signal. Estimated <br />Construction Cost is $73,493.00 which: <br />1) includes State furnished materials <br />(excluding EVP System control and interface <br />equipment) and 2) excludes EVP System <br />materials (cable, detectors and lights). <br />Anticipated Federal -aid share is 90 percent. <br />Anticipated State's share is 5 percent. <br />County's share is 5 percent. <br />2. EVP System. Estimated Construction Cost is <br />$7,594.50 which includes: 1) EVP System <br />materials (cable, detectors and lights) and <br />2) State furnished materials (EVP System <br />69107 <br />- 9 - <br />Page 25 <br />