My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-12-1992 Council Agenda
>
City Council Packets
>
1990-1999
>
1992
>
08-12-1992 Council Agenda
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/8/2013 11:32:27 AM
Creation date
8/8/2013 11:31:43 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ramsey - Washington Metro <br />1,104;4. <br />it District <br />o 1 <br />e m <br />PERMIT <br />2225 White Sear Ave.. <br />Maplewood, Mn. 55109 <br />(6121779-2207 <br />Permission is granted to conduct grading operations in accordance with <br />the Rules and Regulations and Management Plan of the District for the <br />project Gilles Fill Area <br />owned by Joe Gilles <br />� District Permit No. 92 -26 <br />subject to the following special provisions: <br />10. All storm sewer catch basins not needed for site drainage during <br />construction shall be covered to prevent runoff from entering the storm <br />sewer system. Catch basins necessary for site drainage during <br />construction shall be surrounded by a silt fence or double ring of <br />staked hay bales backed by snow fence. The fence or bales shall be <br />installed and maintained around all catch basins until the tributary <br />areas are restored. <br />11. Properly designed filter blanket and riprap shall be installed on the <br />downstream side of all storm sewer outlets. <br />12, All riprap shall be designed and installed with a filter material and <br />meet the Minnesota Department of Transportation specifications for <br />riprap and filter material. <br />13. A silt fence backed by snow fence shall be installed and maintained <br />directly downstream of all outlets. <br />14. The District Administrator, Cliff Aichinger (779- 2207), shall be <br />notified of the pre - construction meeting so he can arrange to attend <br />the meeting. <br />The Board reserves the right to review and revise these special provisions <br />as circumstances may require. This permit may be suspended for failure to <br />comply with the above specified provisions. <br />Approved <br />June 3 <br />19 92. <br />RAMSEY- WASHINGTON METRO WATERSHED DISTRICT <br />signature <br />f <br />Cae President <br />Ti t la <br />NOTE: THE GRANTING OF THIS PERMIT IN NO WAY PURPORTS TO PERMIT ACTS WHICH MAY BE PROHIBITED BY <br />OTHER GOVERNMENTAL AGENCIES. Page 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.