My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12-09-1992 Council Agenda
>
City Council Packets
>
1990-1999
>
1992
>
12-09-1992 Council Agenda
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/8/2013 2:30:05 PM
Creation date
8/8/2013 2:27:57 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Joel Hanson, City Administrator <br />City of Little Canada <br />Page 6 <br />in <br />City project 1984-13 (Bridge Repair) involves land acquisition, construction easements; and <br />signaling costs relating to the I -35B Bridge. Costs to date (December 31, 1991) total $220,406 as <br />shown below. Such costs and possible MSA financing for such costs are as follows: <br />Possible <br />Total MSA <br />Description Costs Financing <br />•Easements $63,705 $63,700 <br />•Engineering 25,859 19,000 <br />•Legal 65,784 None <br />•Appraisal 9,200 9,200 <br />*Other 22,447 None <br />•Signaling 33,411 33,400 <br />Totals $220,406 $125,300 <br />The Bridge Repair project has been in process since 1986 and will not be finalized until acceptance <br />by the State. The City has yet to receive any MSA reimbursements for the above costs. I have <br />discussed this situation with Mr. Ken Straus at the State (296 - 1662). He stated that the City <br />should file for MSA reimbursement for the right -of -way costs incurred by the City. He also stated <br />that the City should n92 have to wait until this project is finalized by the State. We should discuss <br />this situation with the City Engineer. <br />The remaining Construction Deficits represent completed MSA projects which have not been fully <br />financed The proposed financial plan is to finance these deficits from the excess MSA allotments <br />from the Demont Avenue Project (i.e. the $242,000 transferred from the Storm Sewer <br />Construction Project in 1990 plus the additional $94,450 so transferred in 1991). <br />Page 37 <br />
The URL can be used to link to this page
Your browser does not support the video tag.