My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01-27-1993 Council Agenda
>
City Council Packets
>
1990-1999
>
1993
>
01-27-1993 Council Agenda
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/26/2013 2:45:51 PM
Creation date
8/26/2013 2:43:56 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0, / <br />APPENDIX - COST ESTIMATES <br />TAKE STREET - PATCH AND OVERLAY <br />UNIT <br />ITEM UNIT PRICE <br />EST. <br />01!ANTITIY <br />BITUMINOUS PATCHING TON $50.00 <br />BITUMINOUS LEVELING TON $25.00 <br />BITUMTNMOUS OVERLAY, 1.5" TON $18.00 <br />AC -1 BIT. MATERIAL FOR MIXTURE TON $150.00 <br />BITUMINOUS TACK GAL. $1.50 <br />PAVING FABRIC S.Y. $2.00 <br />RAISE CASTINGS EA. $100.00 <br />SOD S.Y. $2.00 <br />STORM SEWER <br />EST. <br />COST <br />100 $5,000.00 <br />150 $3,750.00 <br />220 $4,140.00 <br />25 $3,750.00 <br />150 *225.00 <br />2400 $4,800.00 <br />5 *500.00 <br />1000 $2,000.00 <br />TOTAL ESTIMATED CONSTRUCTION $24,165.00 <br />+10 %CONTIGENCIES $2,416.50 <br />$26,581.50 <br />+25.; DESIGN, INSPECT., ADMIN. $6,645.38 <br />+5% CAPITALIZED INTEREST <br />SUBTOTAL. <br />*33,226.88 <br />$1,661.34 <br />$34,888.22 <br />12" RCP STORM SEWER L.F. $18.00 230 $4,140.00 <br />?4" RCP STORM SEWER L.F. *34.00 60 $2,040.00 <br />'ONNECT TO EX. SEWER EA. $300.00 2 *600.00 <br />TYPE II CATCH BASIN EA. *800.00 2 *1,600.00 <br />STORM SEWER MANHOLE, 4' DIA. EA. *1,000.00 2 $2,000.00 <br />)IPE FOUNDATION IMPROVEMENT L.F. $2,00 290 $580.00 <br />?" DRAIN TILE L.F. $6..00 1400 *8,400.00 <br />TOTAL ESTIMATED CONSTRUCTION $19,360.00 <br />+10 %CONTIGENCIES *1,936.00 <br />*21,296.00 <br />+20% DESIGN, INSPECT., ADMIN. *4,259.20 <br />+5% CAPITALIZED INTEREST <br />SUBTOTAL. <br />TOTAL EST. PROJECT COST <br />Page 9 <br />*25,555.20 <br />*1,277.76 <br />$26,832.96 <br />$61,721.18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.