My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01-27-1993 Council Agenda
>
City Council Packets
>
1990-1999
>
1993
>
01-27-1993 Council Agenda
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/26/2013 2:45:51 PM
Creation date
8/26/2013 2:43:56 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
APPENDIX - COST ESTIMATES <br />LAKE STREET - PLACE NEW SURFACE ON EXISTING BASE <br />ITEM <br />REMOVE BITUMINOUS SURFACING <br />SUBGRADE PREPARATION <br />3ITUMINMOUS SURFACING, 3.5" THICK <br />^.0 1 BIT. MATERIAL FOR MIXTURE <br />)RIVEWAY PATCHING <br />3ITUMINOUS CURBING <br />SITUMINOUS TACK <br />-:RISE CASTINGS <br />SOD <br />STORM SEWER <br />12" RCP STORM SEWER <br />24" RCP STORM SEWER <br />::ONNECT TO E.X. SEWER <br />TYPE II CATCH BASIN <br />STORM SEWER MANHOLE, 4' DIA. <br />'JIPE FOUNDATION IMPROVEMENT <br />DRAIN TILE <br />UNIT <br />UNIT PRICE <br />S .Y. <br />S .Y. <br />TON <br />TON <br />TON <br />L .F. <br />GAL. <br />EA. <br />S .Y. <br />EST. <br />QUANTITIY <br />$2.00 <br />$2.00 <br />$18.00 <br />$150 -00 <br />$50.00 <br />$4.00 <br />$1.50 <br />`.6100.00 <br />$2.00 <br />EST. <br />COST <br />3000 $6,000.00 <br />3000 $6,000.00 <br />560 $10,080.00 <br />38 $5,700.00 <br />80 $4,000.00 <br />700 $2,800.00 <br />300 $450.00 <br />5 $500.00 <br />1000 $2,000.00 <br />TOTAL ESTIMATED CONSTRUCTION <br />+10 %CONTIGENCLE5 <br />$37,530.00 <br />$3,753.00 <br />$41,283.00 <br />+25% DESIGN, INSPECT., ADMIN. $10,320.75 <br />+5% CAPITALIZED INTEREST <br />SUBTOTAL <br />L .F. $18,00 <br />L .F. $34.00 <br />EA. :$300.00 <br />EA. $800,00 <br />EA. $1,000.00 <br />L .F. $2.00 <br />L .F. $6.00 <br />230 <br />60 <br />2 <br />2 <br />290 <br />1400 <br />TOTAL ESTIMATED CONSTRUCTION <br />+10%CONTI6ENCIE5 <br />$51,603.75 <br />$2,580.19 <br />$54,183.94 <br />$4,140.00 <br />$2,040.00 <br />$600.00 <br />$1,600.00 <br />$2,000.00 <br />$580.00 <br />$8,400.00 <br />$19,360.00 <br />$1,936.00 <br />$21,296.00 <br />+20l DESIGN, INSPECT., ADMIN. $4,259.20 <br />+S% CAPITALIZED INTEREST <br />SUBTOTAL. <br />TOTAL EST. PROJECT COST <br />Page 10 <br />$25,555.20 <br />$1,277.76 <br />$26,832.96 <br />$81,016.90 <br />
The URL can be used to link to this page
Your browser does not support the video tag.