My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01-27-1993 Council Agenda
>
City Council Packets
>
1990-1999
>
1993
>
01-27-1993 Council Agenda
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/26/2013 2:45:51 PM
Creation date
8/26/2013 2:43:56 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
d <br />OPTION S <br />APPENDIX - COST ESTIMATES <br />LAKE STREET - STREET RECONSTRUCTION, 28' WIDE <br />ITEM <br />UNIT <br />UNIT PRICE <br />EST. <br />QUANTITIY <br />EST. <br />COST <br />REMOVE BITUMINOUS SURFACING <br />COMMON EXCAVATION <br />SUBGRADE PREPARATION <br />AGGREGATE BASE, CL.5, 100% CRUSHED <br />TYPE 31 BIT. SASE <br />TYPE 41 BIT. WEAR <br />BITUMINOUS PATCHING FOR DRIVEWAYS <br />AC -1 BITUMINOUS MATERIAL FOR MIXTURE <br />BITUMINOUS MATERIAL FOR TACK <br />12" RCP STORM SEWER <br />24" RCP STORM SEWER <br />CONNECT TO EX. SEWER <br />TYPE II CATCH BASIN <br />STORM SEWER MANHOLE, 4' DIA. <br />PIPE FOUNDATION IMPROVEMENT <br />6" DRAIN TILE <br />GEOTEXTILE FABRIC <br />RAISE MANHOLE CASTINGS <br />RAISE GATE VALVE CASTINGS <br />SOD W/ TOPSOIL <br />B618 CONC. CURB AND GUTTER <br />S .Y. <br />C.Y. <br />S .Y. <br />TON <br />TON <br />TON <br />TON <br />TON <br />GAL. <br />L.F. <br />L.F. <br />EA. <br />EA. <br />EA. <br />L.F. <br />L .F. <br />S .Y. <br />EA. <br />EA. <br />S .Y. <br />L .F. <br />52.00 <br />54.00 <br />$2.00 <br />$8.00 <br />518.00 <br />$20.00 <br />$50.00 <br />$150.00 <br />$1.50 <br />$18.00 <br />$34.00 <br />$300.00 <br />$800.00 <br />$1,000.00 <br />$2.00 <br />$6.00 <br />$2.00 <br />$200.00 <br />$100.00 <br />$2.00 <br />$6.00 <br />3000 $6,000.00 <br />1000 $4,000.00 <br />2700 $5,400.00 <br />1400 $11,200.00 <br />200 53,600.00 <br />200 $4,000.00 <br />60 $3,000.00 <br />25 $3,750.00 <br />150 $225.00 <br />230 $4,140.00 <br />60 $2,040.00 <br />2 $600.00 <br />2 $1,600.00 <br />2 $2,000.00 <br />290 $580.00 <br />1400 58,400.00 <br />2700 $5,400.00 <br />3 $600.00 <br />2 $200.00 <br />3000 $6,000.00 <br />1500 $9,000.00 <br />$81,735• .00 <br />$8,173.50 <br />TOTAL ESTIMATED CONSTRUCTION <br />+10%CONTIGENCIES <br />$89,908.50 <br />+20% DESIGN, INSPECT., ADMIN. $17,981.70 <br />+5% CAPITALIZED INTEREST <br />$107,890.20 <br />$5,394.51 <br />TOTAL ESTIMATED COST $113,284.71 <br />Page 14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.