My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01-27-1993 Council Agenda
>
City Council Packets
>
1990-1999
>
1993
>
01-27-1993 Council Agenda
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/26/2013 2:45:51 PM
Creation date
8/26/2013 2:43:56 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
40 l6 V <br />OPTION ,zr 4- <br />APPENDIX - COST ESTIMATES <br />LAKE STREET - GRIND AND OVERLAY AND CONCRETE CURB AND GUTTER <br />ITEM <br />UNIT EST. <br />UNIT PRICE QUANTITIY <br />EST. <br />COST <br />MILL AND GRIND BIT. SURFACING S.Y. <br />SUBGRADE PREPARATION S.Y. <br />INSTALL RECYCLED AGGREGATE BASE TON <br />AGGREGATE BASE, CL.5, 100% CRUSHED TON <br />BITUMINOUS SURFACING, 3" THICK <br />AC -1 BIT. MATERIAL FOR MIXTURE <br />DRIVEWAY PATCHING <br />CONCRETE CURB AND GUTTER <br />BITUMINOUS TACK <br />RAISE CASTINGS <br />SOD <br />STORM SEWER <br />12" RCP STORM SEWER <br />24" RCP STORM SEWER <br />CONNECT TO EX. SEWER <br />TYPE II CATCH BASIN <br />STORM SEWER MANHOLE, 4' DIA. <br />PIPE FOUNDATION IMPROVEMENT <br />6" DRAIN TILE <br />TON <br />TON <br />TON <br />L.F. <br />GAL. <br />EA. <br />S.Y. <br />$2.00 <br />$2.00 <br />$4.00 <br />$8.00 <br />$18.00 <br />$150.00 <br />$50.00 <br />$6.00 <br />$1.50 <br />$100.00 <br />$2.00 <br />3000 <br />3000 <br />250 <br />450 <br />420 <br />28 <br />60 <br />1500 <br />150 <br />5 <br />3000 <br />TOTAL ESTIMATED CONSTRUCTION <br />+10%CONTIGENCIES <br />$6,000.00 <br />$6,000.00 <br />$1.000.00 <br />$3,600.00 <br />57,560.00 <br />$4,200.00 <br />$3,000.00 <br />$9,000.00 <br />3225.00 <br />$500.00 <br />$6,000.00 <br />$47,085.00 <br />$4,708.50 <br />$51,793.50 <br />+25% DESIGN, INSPECT., ADMIN. $12,948.38 <br />+5% CAPITALIZED INTEREST <br />SUBTOTAL <br />L.F. $18.00 <br />L.F. $34.00 <br />EA. $300.00 <br />EA. $800.00 <br />EA. $1,000.00 <br />L.F. $2.00 <br />L.F. $6.00 <br />230 <br />60 <br />2 <br />2 <br />2 <br />290 <br />1400 <br />TOTAL ESTIMATED CONSTRUCTION <br />+10%CONTIGENCIES <br />$64,741.88 <br />$3,237.09 <br />$67,97h.97 <br />$4,140.00 <br />$2,040.00 <br />$600.00 <br />$1,600.00 <br />$2,000.00 <br />$580.00 <br />$8,400.00 <br />$19,360.00 <br />$1,936.00 <br />$21,296.00 <br />+20% DESIGN, INSPECT., ADMIN. $4,259.20 <br />+5% CAPITALIZED INTEREST <br />SUBTOTAL <br />TOTAL EST. PROJECT COST <br />Page 13 <br />$25,555.20 <br />$1,277.76 <br />$26,832.96 <br />$94,811.93 <br />
The URL can be used to link to this page
Your browser does not support the video tag.