Laserfiche WebLink
The City costs for Option 2 includes the installation of storm sewer and drain tile facilities <br />as presented within the original feasibility report. Surface water and subgrade drainage will <br />improve subgrade stability and extend the life of the pavement. <br />We recommend that Option 1 be installed. Option 1 guarantees a long Life street <br />improvement that meets City standards. Because Option 2 does not include the installation <br />of a standard City street section, we cannot guarantee the load carrying capability of the <br />street during the critical spring thaw period. <br />Yours very truly, <br />BONESI'ROO, ROSENE, ANDERLIK & ASSOCIAI'hS, INC. <br />Michael C. Lynch <br />37213.cor <br />Page 2. <br />Page 5 <br />