Laserfiche WebLink
Bonestroo <br />Rosene <br />Anderlik & <br />Associates <br />Engineers & Architects <br />March 4, 1993 <br />City of Little Canada <br />515 Little Canada Road <br />Little Canada, MN 55117 <br />Attn: Mr. Joel Hanson <br />Re: Water Supply Proposal <br />Little Canada, MN <br />Our File No. 372 WS <br />Dear Joel: <br />Otto G. Boncstrou PE <br />Robert W Rosene. PE' <br />Joseph C Anderlrk. PE. <br />Marvin L. Sorvara. PE. <br />Richard E Turner, PE <br />Glenn R. Cook. PE. <br />Thomas E. Noyes. PE. <br />Robert C. Schunichd PE. <br />Susan M. Eberle,. C.PA. <br />'Senior Consultant <br />Froward A. Sanford. PE <br />Keith A Gordon. PE. <br />Robert R Pfefferle. PE <br />Rrchard W Foster, PE <br />David 0 Loskota, PE. <br />Robert C. Russek, AI A <br />Jerry A. Bourdon. PE. <br />Mark A. Hanson. P.E. <br />Mrchael L Rautmann. PE. <br />Ted K. Field. PE. <br />Thomas R. Anderson, Al <br />Donald C. Burgardt, PE. <br />Thomas E. Angus. P.E. <br />Ismael Martinez, P.E. <br />Mrchael P Rau. PE <br />Philp J. Pyne. PE. <br />Agnes M Rrrtg. A IC P <br />Thomas W Peterson, PE. <br />Mrchael C. Lynch, PE. <br />James R. Maland. PE. <br />Jerry D Pertzsch. P.E. <br />Kenneth P Anderson. PE. <br />Mark R. Rolls. PE. <br />Mark A. Sep. PE. <br />.A. Gary W Monen, P.E. <br />Daniel J. Edgerton. PE. <br />Allan Rick Schmidr. PE. <br />Philip J. Caswell, P.E. <br />Mark D Wallis, PE. <br />Miles B. Jensen. PE. <br />L. Phnup Gravel M. PE. <br />Karen L. Wiemen. PE. <br />Gary D. Kustohtz. PE. <br />F Todd Foster. PE. <br />Keith R. Yapp. PE. <br />Douglas J. Benoit. PE. <br />Shawn D Gustafson, PE. <br />Cecilia Olivier. PE. <br />Charles A. Enckson <br />Leo M Pawelsky <br />Harlan M. Olson <br />James F Engelhardt <br />The City desires to initially determine if the cost of supplying and treating their own water is <br />economically feasible compared to continuing purchasing water from St. Paul. The City <br />presently needs a rough capital cost estimate of needed facilities followed by a feasibility study <br />at a later date. Based on our meeting of March 3, cost estimates will be provided for the <br />following types of facilities: <br />A. Alternate No. 1 - Well supply with common softening plant: <br />1. Possible treatment plant site at the existing booster station. <br />2. Two Prairie du Chein - Jordan wells with submersible well pumps. One located <br />adjacent to the plant and a second approximately 1,000 feet away. <br />3. Raw water main. <br />4. Softening water treatment plant including chemical addition, filtration for iron and <br />manganese removal, zeolite softeners, backwash reclamation, clearwell and high <br />service pumps. <br />5. Standby power generator. <br />B. Alternate No. 2 - Well supply with common iron and manganese removal plant: <br />1. Plant site, wells and water main same as Alternate No. 1. <br />2. Iron and manganese removal plant including chemical addition, filtration, backwash <br />reclamation, clear well and high service pumps. <br />3. Standby power generator. <br />C. Alternate No. 3 - Wells with individual softening plants: <br />1. Treatment plant to serve one well located on same site and adjacent to a trunk water <br />main. <br />2. Prairie du Chein well with submersible pump. <br />372.cor <br />Page 1. <br />Page 56 <br />/11C \Y /net Llleth•rov ZA • Ct A's t RANI CC117 • I -Dt Al-AA <br />