Laserfiche WebLink
r1 H '. - 0 - c. T H U 1 6 C 1 S E: 0 h-I E '_: T F . : 0 O = . f9 '3. _ O C I iti T E :E F' - 0 <br />May 20, 1993 <br />RECLAMATION PROJECT ALTERNATIVE <br />COST ESTIMATE - STREET AND STORM SEWER CONSTRUCT <br />ITEM UNIT <br />MOBILIZATON L.S. 310,000.00 1 <br />RECLAMATION S.X. 31.25 11000 <br />BASE PREPARATION S,Y. 31.00 11000 <br />AGGREGATE BASE FOR STREET, 2" TON 37.00 1.500 <br />BITUMINOUS MATERIAL FOR MIXT. 3.5" TON $16.00 2500 <br />AC -1 BITUMINOUS MATERIAL TON $140.00 165 <br />AGGREGATE BASE SHOULDERING TON 39,00 500 <br />BITUMINOUS PATCH FOR DRIVEWAYS TON 350.00 100 <br />AGGREGATE BASE FOR DRIVEWAYS TON 37.00 300 <br />BITUMINOUS TACK GAL. 31.50 S00 <br />RAISE CASTINGS EA, 5200.00 10 <br />TOPSOIL BORROW C.Y. $20.00 200 <br />SEED W/ FERTILIZER AND MULCH AC. $2,000.00 1.5 <br />SOD S.Y. 32.00 1000 <br />SUBTOTAL <br />UNIT EST. <br />EST. <br />PRICE QUANTIT COST <br />310,000.00 <br />313,750.00 <br />311,000.00 <br />310,50000 <br />$40,000.00 <br />323,100.00 <br />$4,500.00 <br />$5,000.00 <br />32,100.00 <br />51,200,00 <br />32,000.00 <br />$4,000.00 <br />33,000.00 <br />$2,000.00 <br />$132,150.00 <br />36" STORM SEWER L.F. 548.00 36 31,728,00 <br />24" STORM SEWER L.F. $30.00 350 $10,500.00 <br />21" STORM SEWER L.F. $27.00 30 $810.00 <br />18" STORM SEWER L.F. 324.00 40 3960.00 <br />12" STORM SEWER L.F. $20.00 30 5600,00 <br />36" RCP FLARED END SECTION EA. 3850,00 2 51,700.00 <br />PIPE FOUNDATION IMPROVEMENT L.F. 32.00 486 3972.00 <br />STORM SEWER MANHOLE, 4' DIA, EA. $1,000.00 5 35,000.00 <br />CATCH BASIN, TYPE II EA. 3850.00 1 $850.00 <br />RIP RAP C.Y. 350.00 28 $1,400.00 <br />GRANULAR FILTER MATERIAL C.Y. $25.00 14 3350.00 <br />AUTOMATIC DRAINAGE GATE, 24" EA. 5900.00 1 $900.00 <br />SEED W/ FERTILIZER AND MULCH AC. 32,000.00 0.2 3400.00 <br />SUBTOTAL 326,170.00 <br />TOTAL ESTIMATED CONSTR 3158,320.00 <br />+ 10% CONTINGENCIES 315,832.00 <br />3174,152.00 <br />+25% DESIGN, INSPECT., AD 843,538.00 <br />3217,690.00 <br />+ 5% CAPITALIZED INTERES 310,884.50 <br />TOTAL ESTIMATED COST 3228,574.50 <br />Page 23 <br />