My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10-12-1993 Council Agenda
>
City Council Packets
>
1990-1999
>
1993
>
10-12-1993 Council Agenda
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/5/2013 11:53:37 AM
Creation date
9/5/2013 11:51:27 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mayor & City Council <br />October 8, 1993 <br />Page 2 <br />It is also important to remember that the assessment is <br />based 1/2 on a per lot basis and 1/2 on a front foot <br />basis. This was done based on the results of the survey we <br />conducted of the property owners where their preference was <br />split 50/50 for each respective method. It is also <br />important to note that the per lot cost estimated at the <br />time of the survey was $3,860.53 per lot as compared with <br />$2,897.88 at this time. The lineal foot cost at the time <br />of the survey was estimated at $38.19 verses the $30.25 <br />used in this calculation. Obviously, the project came in <br />substantially under estimates which is a benefit to both <br />property owners and the City. <br />JRH:kpv <br />Enclosures <br />Page 35 <br />
The URL can be used to link to this page
Your browser does not support the video tag.