Laserfiche WebLink
EXHIBIT 15 <br />PRELIMINARY COST ESTIMATE <br />ARKWRIGHT- SUNRISE AREA STREET IMPROVEMENTS <br />PRELIMINARY COST ESTIMATE <br />STREET AND UTILITY IMPROVEMENTS <br />MAPLEWOOD CITY PROJECT NO, 12 -09 <br />Item <br />Description <br />Unit <br />Estimated <br />TOTAL <br />Unit <br />Price <br />EST. <br />QTY. <br />EST. <br />COST <br />STREET ITEMS <br />2021.501 <br />2701.5006 <br />2101..._.., <br />2101.5007 7 <br />......._ <br />2104.501 <br />2104.505 05 <br />2104.505 <br />2104 5505 5 <br />2104.511 <br />., <br />2104 513 3 <br />_., <br />2105.501 1 <br />2105.507 <br />_., <br />2105.522 <br />......,. <br />2105.526 6 <br />.. <br />2105 604 4 <br />10 <br />2723.610 <br />1 <br />2130.501 <br />..., <br />2271.5501 1 <br />2211,501 <br />2211.501 <br />507 <br />5011 <br />2232 603 603,, <br />2331 6603 3 <br />.. <br />2340.508 8 <br />2340.514 <br />. <br />2340,521 <br />0 <br />2357 5D2 2 <br />....1 <br />2411.618 <br />_. <br />25311.501 .501 <br />2531 07 07 <br />, <br />2531.507 07 <br />2531.532 <br />2540.602 <br />6 <br />zss3s0l <br />2573.502 <br />...502 <br />25]3.607 <br />.2 <br />2573.602 <br />23 <br />2575.523 <br />2575.5353 <br />2 <br />2575.604 604 <br />..... <br />2340.XXXX XXXX <br />MOBILIZATION <br />..I. ... ...... .... ............._. <br />CLEARING NG AND GRUBBING <br />CLEARNGA.. N ........ ...................... <br />CLEARING AND GRUBBING <br />......N .._.B.. T .. ........... <br />REMOVE CONCRETE CURB AND GUTTER <br />REMOVE DRIVEWAY REMOVE BITUMINOUS DRIVEWAV PAVEMENT <br />CO .., V. ..._ ENT/ <br />REMOVE CONCRETE DRIVEWAY PAVEMENT /APRONANAIK <br />.I. ..... .. . ... ........... <br />REMOVE BITUMINOUS ROADWAY PAVEMENT (INCLUDES ANY BIT CURB) <br />.... ...._.. .. ., .. . . <br />SAW CONCRETE PAVEMENT (INCLUDES CURB & GUTTER, DRIVES, AND WALKS) <br />...MI. DRIVEWAY SAW BITUMINOUS DRIVEWAY PAVEMENT <br />NEX EXCAVATION (P ................. <br />COMMON EXCAVATION (P) <br />SUBGRADE EXCAVATION, EV <br />.._R RO <br />SELECT GRANULAR BORROW CV <br />.. T._..P ...R..._..... ............. <br />SELECT TOPSOIL BORROW, lV <br />TYPE.... ............ <br />GEOTEXTILE FABRIC TYPE V (SUBCUT) <br />TSW WITH P OM..... <br />STREET SWEEPER WH PICKUP BROOM <br />...... FOR .............. <br />WATER FOR DUST CONTROL <br />GT ...S <br />AGGREGATE BASE CLASS 6 FOR STREETS <br />... <br />ADDITIONAL AGGREGATE ATE BASE CLASS 6 FOR STREETS <br />AGGREGATE A....... .I.VEW... .. .. ......_ <br />AGGREGATE BASE CLASS 6 FOR DRIVEWAYS TRAILS AND WALKS <br />TUMI. F...C. _._H ............ .......... <br />MILL BITUMINOUS SURFACE, 1.5" DEPTH @ MINIMUM 18" WIDE <br />.I.. .. A ................ .......... <br />BITUMINOUS ROAD PAVEMENT CONTROL JOINT SAW AND SEAL <br />... _...... ....(5... . _....... _. _ ............ <br />TYPE LV3 WEARING COURSE MIXTURE RE (B) <br />.. ... I ... .............. ...,.........,..... ....... <br />TYPE V3 NON-WEARING C OURSE MIXTURE (B) <br />LV ... .. COURSE ..(.L .. HICK. AND lV4 WEARING COURSE MIXTURE (L), 3 -INCH THICKFOR DWYS AND TRAILS <br />I...... . FOR TACK COAT <br />................ .........,.. ........_. <br />BITUMINOUS MATERIAL L FO f <br />..._.._.. II ..... ............... ...,..,........_ ........ <br />ENGINEERED MODULAR BLOCK RETAINING WALL <br />T... C DESIGN 8. 6. . ... ............. ......... <br />CONCRETE C&G, DLSIGN 8612, 86i e, 8624, RIBBON OR TRANSITION <br />....CON EW ..4...G ......... ................. ............ <br />44NCH CONCRETE SIDEWALK (INCL. 4 " GRAVEL BASE) <br />... CONCRETE .. DE, ... ............................... <br />6-INCH CONCRCTC DRIVEWAY PAVEMENT, RESIDENTIAL <br />PEDESTRIAN ..............._..... <br />PEDESTRIAN CURB RAMP <br />.. . .. ) <br />REINSTALL L MAILBOX SUPPORT (SALVAGED) <br />..I.. _. ...... .................... <br />TRAFFFIC C CONTROL <br />.,.... .... ................... <br />SILT FENCE, TYPE HEAVY DUTY <br />C <br />... .... ..._. <br />EROSION CONTROL, CONTRACTOR'S PLAN <br />.._... I._.. ........ <br />FURNISH AND MAINTAAIN N ROCK ENTRANCE PAD AS PER PLATE 350 <br />EROSION CONTROL BLANKET, CATEGORY 2 <br />...,.F .. . SS 20-0-10/10.0.20 . F .. SE .. AREAS W MIX FERT., ANALYSIS FOR SODDED /SEEDED AREAS W/ MIX 270 <br />...I G,.... N.(_... 2_..R... ... 0LS. /. ......... ....... <br />SODDING, TYPE LAWN (INCLUDING 270R7 SEED'S 30 LB /AC) <br />.... PDG .........._ . ............._ ............... ............ <br />PRIVATE DRIVEWAY UPOGRAOES <br />LS <br />EACH <br />EACH <br />ACRE <br />LF <br />.. ........ <br />SY <br />SY <br />SY <br />LF <br />LF .... <br />CY <br />................ <br />CY <br />.- ...... <br />CY <br />CY <br />SY <br />HOUR <br />M GAL <br />GAL L <br />TON <br />... <br />TON <br />TON <br />._...., <br />LF <br />LF <br />.. .... <br />TON <br />., ....,, <br />TON <br />SY <br />GAL <br />SF <br />LF <br />SF <br />SY <br />EACH <br />EACH <br />LS <br />LF <br />.......LS..... <br />EACH <br />SY <br />LB <br />SY <br />$150,000.00 <br />3300.00 <br />35,000.00 <br />53.00 <br />...............0. <br />533.000 <br />.... <br />35.00 <br />.. $... <br />$11.550 0 <br />...._..... <br />....,,. <br />54.50 <br />53.00 <br />.. _ <br />$110.0.00 <br />MOO........... <br />.,......_ <br />$14.00 <br />5 <br />........5... <br />515.000 <br />5 <br />....1i ,75 5 <br />._. <br />5 <br />5125.00 <br />550.00 <br />511.50 <br />51 <br />..1...5.. <br />511.50 0 <br />.... ..0 . <br />514.00 <br />54 <br />.- .,....... <br />54.550 0 <br />...5.... <br />$11.770 0 <br />570.00 <br />570.00 <br />... , <br />518 <br />.....516....000 0 <br />,,..... ...2.. <br />52.25 <br />...,..5.. .. <br />535.00 <br />$11.00 <br />..........$5.00 <br />............1.... <br />$441.000 0 <br />3600.00 <br />5150.00 <br />5205.200.0.. ,0000.00 0 <br />......V.8.5 <br />51.85 <br />510.000.00 <br />.._. <br />51,100.00 <br />$2.00 <br />30 <br />................. <br />_.... 50.555 5 <br />$3.00 <br />325,000.00 <br />1.00 <br />5150,000.00 <br />100.00 <br />$30,000.00 <br />1,50 <br />1,400.00 <br />2,103.56 <br />3,092.67 <br />35,165.78 <br />1,320.00 <br />1,160.00 <br />13,233.15 <br />8,392.22 <br />6,173.33 <br />3,858.26 <br />9,260.00 <br />200.00 <br />$7,500.00 <br />$4,200,00 <br />$6,310.67 <br />515,463.33 <br />$52,748.67 <br />$5,940.00 <br />53,480.00 <br />5132,331.48 <br />$67,137.78 <br />$86,426.67 <br />$57,873.96 <br />$16,205.00 <br />$25,000,00 <br />460.00 <br />$23,000.00 <br />16,893.19 <br />2,825.28 <br />1,659.00 <br />600.00 <br />10,439.33 <br />2,979.25 <br />$194,271.72 <br />532,490.74 <br />523,226.00 <br />52,700.00 <br />$17,748.87 <br />$208,547.50 <br />4,022.19 <br />2,104.44 <br />1,748.78 <br />250.00 <br />22,386.00 <br />1,500.00 <br />3,095.56 <br />5281,553.22 <br />$37,880.00 <br />$3,934.75 <br />$8,750.00 <br />$246,246.00 <br />$7,500.00 <br />$126,917.78 <br />4.00 <br />152,00 <br />1,00 <br />3,590.00 <br />$2,400.00 <br />$19,760.00 <br />$20,000.00 <br />$6,641,50 <br />1.00 <br />6.00 <br />5,675.00 <br />1,434.91 <br />34,724.72 <br />$10,000.00 <br />56,600.00 <br />$11,350.00 <br />$789.20 <br />$104,174.17 <br />1.00 <br />$25,000.00 <br />STORM SEWER <br />2104.501 REMOVE & DISPOSE OF STORM SEWER PIPE (ANY SIZE & TYPE) <br />2104.509 REMOVE /ABANDON DRAINAGE STRUCTURE & SALV. CSTG. (CB, MH OR CB -MH) <br />3.... T .. ..... ...._... LA.. _.... 4 ...................... <br />2451.603 AGGREGATE PIPE FOUNDATION PER STANDARD PLATE NO. 440 & 540 <br />251... FDR G W/ . ......... ............. ...,,....................... <br />2502.541 4 PERF DRAM TUBING W/ GEO./ROCK <br />11.... RRU SMOOTH HDPE .. ................ ................._......... <br />2503.511 12" CORRUGATED SMOOTH WAIL O PIPE SEWER <br />35.1_. CORRUGATED ..........., ......................... <br />2503.511 1v CORRUGATED SMOOTH WALL HOPE PIPE SEWER <br />...RRU _..., ............. ... .. .. ........................... <br />2503.5571 11 18" CORRUGATED SMOOTH WALL HDPE PIPE SEWER <br />50 <br />TOTAL = <br />$2,082,096.99 <br />LF <br />EACH <br />LF LE... <br />..._.. <br />LF <br />IF <br />LF............... <br />L.F <br />9.00 <br />300.00 <br />8.00 <br />5.00 <br />........ <br />5 <br />22.00 <br />....,... <br />255.000 0 <br />._,. <br />28.00 <br />490.00 <br />$4,410.00 <br />17.00 <br />450.00 <br />10,000.00 <br />783.00 <br />2,555.00 <br />1,840.00 <br />55,100.00 <br />$3,600.00 <br />$50,000.00 <br />$17,226.00 <br />$63,875.00 <br />551,520.00 <br />EXHIBIT 15 <br />