Laserfiche WebLink
EXHIBIT 15 <br />PRELIMINARY COST ESTIMATE <br />ARKWRIGHT•SUNRISE AREA STREET IMPROVEMENTS <br />PRELIMINARY COST ESTIMATE <br />STREET AND UTILITY IMPROVEMENTS <br />MAPLEWOOD CITY PROJECT NO. 12 -09 <br />Item <br />Description <br />Unit <br />Estimated <br />TOTAL <br />Unit <br />Price <br />EST. <br />QTY. <br />EST. <br />COST <br />2506.502 <br />2506 522 <br />2 <br />2506 602 <br />2506.602 <br />5 2 <br />2511 502 <br />2 <br />2S]t 602 <br />2571 602 <br />2571 604 <br />7353 <br />2573530 <br />. ..,...., -.. <br />2503.603 <br />CONST. DRAINAGE STRUCTURE, DESIGN 2' x 3' BOX CB WI R- 306 / V FR. & GR. <br />RAIN- T.,..... MH ..... <br />DRAINAGE STRUCT., DESIGN 48" MH OR CB -M1-1 W/ R 3067 V OR R-1678 -A <br />.. (. ..,.E. BT... ....... ...... <br />ADJUST CASTING (STORM SEWER MH IN BIT. OR C &G) <br />TRIJC LE...ST SEWER M ..... <br />RECONSTRUCT MANHOLE (STORM SEWER MH IN BIT. OR C &G) <br />... TO A E... RE(M.. <br />CONNECT TO EX. DRAINAGE STRUCTURE (MH, CB/MH OR BUILD OVER EX. PIPE) <br />A..... ....RP SFLARED-ENDS) ...... <br />STORM WATER OUTLETS (RIPRAP PLUS <br />RAIN I... ....N. TO.... ..... ....., <br />LARGE RN WATCR GARDEN PREPARATION <br />GARDEN <br />RESIDENTIAL RAIN WATER GARDEN PREPARATION <br />_ OU., ATI..,, ......,... .....,. <br />UNDERGROUND INFILTRATION SYSTEM <br />RO... ........... .............. ...._ <br />INLET PROTECTION ,,,., <br />..IN PEST PIPE ..P.I.. ..... <br />PIPE BEDDING FOR HOPE STORM SEWER P ANY SIZE <br />EACH <br />EACH <br />EACH <br />EACH <br />- <br />EACH <br />EACH <br />EACH <br />EACH <br />EACH <br />EACH <br />.......LF. <br />1,400.00 <br />24.00 <br />$33,600.00 <br />1,800.00 <br />40.00 <br />72,000.0 <br />330.00 <br />2,500.00 <br />640.00 <br />2,700.00 <br />10.00 <br />$3,300.00 <br />2.00 <br />$5,000.00 <br />9.00 <br />$4,860.00 <br />2.00 <br />$5,400.00 <br />10,00a 00 <br />2,500.00 <br />3.00 <br />$30,000.00 <br />34.00 <br />$85,000.00 <br />10,000.00 <br />5140.00 <br />... <br />.....5.00 <br />5.00 <br />$50,000.00 <br />78.00 <br />$10,920,00 <br />900.00 <br />$4,500.00 <br />TOTAL= <br />5600,371.00 <br />SANITARY SEWER SYSTEM <br />2104.603 <br />2503.602 <br />2603.603 <br />2503.603 603 <br />.... _. . <br />2506.522 <br />21 <br />21044.5509 09 <br />......03. <br />2503.603 <br />...... <br />2503.603 <br />ABANDON 20 -INCH SANITARY SEWER FORCE MAIN <br />REPAIR 8" SS MAIN PER PLT 409 <br />LINING SEWER PIPE B <br />RECONSTRUCT MANHOLE <br />FURNISH & INSTALL CASTING (SAN. SEWER ER MH IN BIT. OR OR C&G) <br />SALVAGE CASTING <br />...AN,...S ....., /BP PLATE 4" OR 6" PVC, SCH. 40 SAN. SEW SERV. /ftEPL AS PER PLATE 410 OR 470A <br />DN E.._...... ....... <br />PIPE BEDDING FOR PVC SANITARY SEWER PIPE <br />LF <br />EACH <br />LF <br />...... <br />LF <br />EACH <br />EACH <br />... <br />LF <br />_.. <br />LF <br />14.0D <br />2,000.00 <br />....... <br />29.00 00 <br />190 <br />...... <br />190.000 0 <br />550.00 <br />80.00 <br />38 <br />......... <br />,.,,...,38;000 0 <br />5.00 <br />1,400.00 <br />$19,600.00 <br />1.00 <br />4,109.00 <br />84.00 <br />$2,000.00 <br />$119,161.00 <br />$15,960.00 <br />39.00 <br />39.00 <br />1,590.00 <br />WATER SYSTEM <br />2104.501 <br />....... <br />2504.602 <br />25044.6602 02 <br />2504.602 <br />204.602 602 <br />2504.603 <br />.460.3 <br />250h.603 <br />25066.5521 21 <br />300,00 <br />TOTAL= <br />521,450.00 <br />53,120.00 <br />$60,420.00 <br />51,500,00 <br />$223,611.00 <br />REMOVE WATER MAIN <br />WATER UTILITY HOLE (EXCAVATE & BACKFILL) <br />.... ..._. ... .. <br />WATER UTILITY OFFEST /REPIACCMENTNT TRENCH (EXCAVATE &BACKFILLLL) <br />ADJUST CURB STOP BOX <br />ADJUST GATE VALVE <br />....... <br />WATERMAIN UTILITY SERVICE TRENCH (EXCAVATE AND BACKFILL) <br />.... _... .I. ............ <br />WATERMAIN UTILITY MAIN N TRENCH (EXCAVATE AND eACKFIIy <br />FURNISH AND INSTALL CASTING ASSEMBLY, TYPE FORD COVER A -1 <br />LF <br />...... <br />EACH <br />LS <br />EACH <br />... <br />EACH <br />LF ... <br />LP..... <br />LF <br />EACH <br />4.00 <br />1,600.00 <br />5,000.00 <br />90.00 <br />200.00 <br />30.00 <br />24.00 <br />00 <br />150.00 <br />10,725.00 <br />542,900,00 <br />6.00 <br />$9,600.00 <br />5.00 <br />22.00 <br />$25,000.00 <br />$1,980.00 <br />6.00 <br />1,350.00 <br />10,725.00 <br />EXHIBIT 15 <br />51 <br />18.00 <br />TOTAL = <br />$1,200.00 <br />$40,500.00 <br />5257,400.00 <br />52,400.00 <br />5380,980.00 <br />SUBTOTAL = $3,186,998.99 <br />