My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-25-2013 Council Agenda
>
City Council Packets
>
2010-2019
>
2013
>
09-25-2013 Council Agenda
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/23/2013 2:18:47 PM
Creation date
9/23/2013 1:52:41 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
141
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2.32 Existing Pavement and Geotechnical Conclusions <br />There is a high level of surface cracking along with a large amount of patches and potholes on the <br />existing streets. Staff believes there are several issues at work relative to the current state of the <br />pavements: <br />• Streets with inadequate crown and lack of formal edge drainage conveyances (i.e. <br />concrete curb and gutter) allow water to pond in small depressions and scour the <br />pavement surface. As the street ages, depressions in the pavement trap water, subjecting <br />the pavement to freeze -thaw pop -outs and edge cracking. This deterioration eventually <br />forms potholes over time. <br />• A lack of aggregate base does not allow for an adequate spread of vehicle loading over <br />the roadway subgrade, resulting in pavement damage over time. <br />• The silts and clays found in the northeastern portion of the project likely have inadequate <br />drainage causing freeze -thaw damage within the roadway. <br />• The bituminous overlay installed in the late 1980's is over 25 years old and has reached <br />the end of it's useful life. <br />• The streets in the Arkwright- Sunrise neighborhood have deteriorated to the point at which <br />routine maintenance is no longer cost - effective. <br />Correcting the drainage problems on the streets, as well as constructing a new pavement section <br />to the most current standards, allows for a high - quality, long- lasting product, and is considered <br />critical to the performance of any road cross - section for this project. <br />2.4 Existing Curb <br />The majority of the project streets do not have concrete curb and gutter. The absence of a curb <br />and gutter with a concrete gutter pan forces storm water to flow along the edge of the existing <br />bituminous road and boulevard edges often resulting in the following: <br />• Deterioration and erosion of boulevard edges. <br />• Pooling of water that may spread into the drive lanes and driveways. <br />• Deterioration of bituminous pavements which leads to weakened edge support and poor <br />drainage conveyance as depicted in Figure 2 on the following page. <br />• Deterioration of driveway ends due to freeze -thaw weakening of the pavement. <br />• Improper containment of vehicles and plows within the roadway section. <br />• Difficulty implementing future maintenance treatments. <br />8 <br />18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.