Laserfiche WebLink
MEMORANDUM <br />TO: Joel Hanson <br />FROM Jerry Bourdon <br />DATE: June 3, 1994 <br />SUBJECT: Fill Permit <br />Norm's Tire <br />VIA FAX: 484 -2177 <br />I have reviewed the fill permit submittals, inspected the <br />site and had discussions with the contractor requesting the <br />permit. From this I believe that the fill proposal is <br />reasonable with the following understanding. <br />- Erosion Control: The contractor must provide erosion <br />control. silt fence at the toe of the slope and prompt <br />seeding of the fill should be sufficient. I suggest that <br />the contractor meet with a City representative (Harlan <br />Olson or I could do this) to work out the details as the <br />work progesses. <br />- Existing condition: There will be some loss of existing <br />brush and trees. I believe the tree loss will be minor <br />but mention it here to make you aware of this. <br />- Permission from property owner: Permission from the <br />property owner should be verified. (I understand that <br />Norm's tire has requested the fill permit from the city <br />during previous attempts to fill this area and this in <br />itself may be sufficient to assure the City that the <br />contractor has the property owner approval.) <br />T0'd <br />Page 15 <br />'329V 9 00&LSNO9 TT2T 929 ET9 <br />LT:ET 1766T -20 -90 <br />