Laserfiche WebLink
PART 1A - COUNTRY DRIVE MILL AND OVERLAY <br />COST ESTIMATE <br />ITEM <br />UNIT EST. <br />EST. <br />UNIT PRICE QUANTITY COST <br />MOBILIZATON <br />TRAFFIC CONTROL <br />RECLAMATION OF BIT. SURFA <br />MILL SURFACE FOR PATCH <br />BITUMINOUS PATCH <br />REMOVE AND REPLACE CURB <br />RAISE MANHOLE CASTINGS <br />TYPE 41 BITUMINOUS WEAR <br />AC -1 BIT. MA 1'ERIAL FOR MIXT <br />BIT. MA IERIAL FOR TACK <br />L.S. <br />L.S. <br />S.Y. <br />S.Y. <br />TON <br />L.F. <br />EA. <br />TON <br />TON <br />GAL. <br />$2,500.00 <br />$1,500.00 <br />$1.00 <br />$3.00 <br />$50.00 <br />$15.00 <br />$150.00 <br />$20.00 <br />$140.00 <br />$1.50 <br />1 <br />1 <br />10600 <br />400 <br />100 <br />300 <br />9 <br />1100 <br />72 <br />600 <br />$2,500.00 <br />$1,500.00 <br />$10,600.00 <br />$1,200.00 <br />$5,000.00 <br />$4,500.00 <br />$1,350.00 <br />$22,000.00 <br />$10,080.00 <br />$900.00 <br />TOTAL EST. CONSTRUCTION <br />+ 10% CONTINGENCIES <br />+20% DESIGN, INSPECT., ADMI <br />+ 5% CAPITALIZED IN PUREST <br />TOTAL ESTIMATED COST <br />$58,730.00 <br />$5,873.00 <br />$64,603.00 <br />$12,920.60 <br />$77,523.60 <br />$3,876.18 <br />$81,399.78 <br />Page 144 <br />