Laserfiche WebLink
Mr. Joel Hanson April 4, 1994 <br />City of Little Canada <br />Page -2- <br />We propose to reclaim the existing bituminous material for re -use as aggregate base in <br />raising the roadway to its original grade. (We will also use the milled material generated <br />from Part 1 work for placement as aggregate base to reduce Part 2 costs). Six (6) inches <br />of bituminous surfacing will be replaced on the roadway the full width of the roadway. The <br />concrete curb and gutter on the north side of the roadway is in good condition and will <br />remain. A 6" bituminous berm curb will be re- installed on the south side of the roadway <br />as additional future settlement is anticipated. <br />We estimate that Part 2 can be completed for an project cost of $50,500, or $112 per lineal <br />foot. Estimated project costs for Part 1 and Part 2 improvements are quite favorable when <br />compared to the cost of complete reconstruction of the street, which is on the order of <br />$200 -$225 per lineal foot. <br />We would be pleased to meet with you to further discuss improvement options. We need <br />authorization to proceed with the preparation of plans and specifications for the <br />improvement. We intend to combine this project with other 1994 improvement projects so <br />as to gain an economy of scale. <br />Yours very truly, <br />BONESTROO, ROSENE, ANDERLIK & ASSOCIATES, INC. <br />71. <br />Michael C. Lynch <br />Encl. <br />Page 143 <br />