Laserfiche WebLink
14 <br />13 <br />12 <br />11 <br />10 <br />c <br />C <br />h. <br />m <br />a <br />c 9 <br />0 <br />c <br />E e <br />u <br />c <br />m <br />2 7 <br />6 <br />s <br />4 <br />SCHEDULE A2 <br />0.01 <br />O.CS 0 1 0.3 1 5 10 <br />Net consaucian cost. In millions of dollar <br />50 100 <br />FIG. 2 -.CURVE B, MEDIAN COMPENSATION FOR BASIC SERVICES, <br />EXPRESSED AS A PERCENTAGE OF CONSTRUCTION COST FOR <br />PROJECTS OF AVERAGE CCMPLEXITY. <br />ASCE Manual No. 45 <br />-23- <br />Page 188 <br />lI <br />Him 1 1 1 1 10lli 1 1 11111 <br />Net Construction <br />Cost % From <br />Can 8 <br />- <br />- <br />- <br />- <br />l <br />1 <br />• 100,000 9.01 ' <br />250,000 7.81 <br />500,000 7.00 <br />750,000 6.63 <br />1,000,000 6.22 <br />2,000,000 5.75 <br />4.000,000 5.30 <br />6,300,000 5.10 <br />3,003,000 5.05 <br />10,000,000 4.97 . <br />20,000,000 4.88 <br />H <br />1 <br />1 <br />11111 <br />iiie <br />III <br />I <br />1111 <br />1911 <br />I 1 <br />III <br />( <br />I <br />II <br />0.01 <br />O.CS 0 1 0.3 1 5 10 <br />Net consaucian cost. In millions of dollar <br />50 100 <br />FIG. 2 -.CURVE B, MEDIAN COMPENSATION FOR BASIC SERVICES, <br />EXPRESSED AS A PERCENTAGE OF CONSTRUCTION COST FOR <br />PROJECTS OF AVERAGE CCMPLEXITY. <br />ASCE Manual No. 45 <br />-23- <br />Page 188 <br />